A - 8
Ver.1.36
3.8.1
Connecting Auto-Shot sampler (AS-1020E) ···································································· 3-6
3.8.2
Connecting other peripheral devices ·············································································· 3-6
3.9 INSTALLING CONTROL SOFTWARE ··················································································· 3-7
3.9.1
Installing USB serial communication device driver ···························································· 3-7
3.9.2
Installing control software ···························································································· 3-8
3.9.3
Setting COM port ······································································································· 3-8
3.10
FRONT, BACK, SIDE, AND TOP VIEWS ············································································· 3-10
3.10.1 Pyrolyzer ················································································································· 3-10
3.10.2 Temperature Controller ······························································································· 3-11
CHAPTER 4 USING CONTROL SOFTWARE
····································································
4-1
4.1
START UP AND SCREEN LAYOUT ······················································································ 4-1
4.1.1
Starting program ······································································································· 4-1
4.1.2
Screen layout ··········································································································· 4-2
4.2
BEFORE STARTING AN ANALYSIS ····················································································· 4-4
4.2.1
System configuration ·································································································· 4-4
4.2.2
Set-up interface temperature························································································ 4-6
4.3
SET-UP ANALYTICAL MODES AND OPERATION ································································· 4-7
4.3.1
Set-up for Single-Shot analysis and operation procedure ··················································· 4-7
4.3.2
Set-up for Double-Shot analysis and operation procedure ·················································· 4-9
4.3.3
Set-up for Direct EGAt analysis and operation procedure ··················································· 4-12
4.3.4
Set-up for Heart-Cut EGA analysis and operation procedure ·············································· 4-14
4.4
OTHER FUNCTIONS ······································································································· 4-17
4.4.1
Saving/loading analysis set-ups ···················································································· 4-17
4.4.2
Temperature calibration of pyrolyzer furnace and other set-ups ··········································· 4-17
4.4.3
Printing set-ups ········································································································· 4-20
4.4.4
Set-up the Py Conditioning Table ·················································································· 4-20
CHAPTER 5 FOUR ANALYSIS METHODS AND SAMPLE PREPARATION
····························
5-1
5.1
SINGLE-SHOT ANALYSIS ·································································································· 5-1
5.2
EVOLVED GAS ANALYSIS (EGA) ························································································ 5-3
5.3
DOUBLE-SHOT ANALYSIS ································································································· 5-5
5.4
HEART-CUT ANALYSIS ····································································································· 5-7
5.5
SAMPLE PREPARATIONS ································································································· 5-9
5.6
SELECTION OF SAMPLE CUPS AND STICKS ······································································· 5-11
CHAPTER 6 MAINTENANCE
·························································································
6-1
6.1 ROUTINE MAINTENANCE ·································································································· 6-1
6.1.1 Cleaning sample cups (Eco-cup) ······················································································ 6-1
6.1.2 Replacing and cleaning quartz pyrolysis tube ······································································ 6-3
6.1.3 Interface needle ············································································································ 6-7
6.1.4 GC injection port ··········································································································· 6-8
Содержание EGA/PY-3030D
Страница 1: ...Ver 1 36 MULTI SHOT PYROLYZER MODEL EGA PY 3030D OPERATION MANUAL www frontier lab com ...
Страница 5: ...A 5 Ver 1 36 CONTENTS IN THE PACKAGE ...
Страница 6: ...A 6 Ver 1 36 ...
Страница 27: ...3 9 Ver 1 36 Fig 3 7 Resetting COM port number ...