
56
The startup test takes five minutes. The time elapsed is indicated by a bar shrinking
from the top down.
Whenever two scale divisions stop flashing and disappear, 1/10 of the total duration
of the test is over.
Operation of
Feeding Energy
into the Grid
-
Once the tests have been completed, the inverter starts feeding power into the grid.
-
The display shows the present power feeding into the grid.
-
The Operating Status LED lights up green, and the inverter starts operating.
Содержание IG 2000
Страница 2: ...0...
Страница 4: ...2...
Страница 6: ...4...
Страница 10: ...8...
Страница 15: ...General Information...
Страница 16: ......
Страница 21: ...Installation and Startup...
Страница 22: ......
Страница 50: ...48...
Страница 51: ...Operation...
Страница 52: ......
Страница 80: ...78...
Страница 81: ...Troubleshooting and Maintenance...
Страница 82: ......
Страница 95: ...Appendix...
Страница 96: ......
Страница 113: ...111 EN US...
Страница 114: ...112...
Страница 115: ...113 EN US...