42
-
Synchronization with grid:
‘WAIT PS’ is displayed, the inverter
icon flashes: the inverter is waiting for
all power stage sets in the network to
be on stand-by. This procedure takes
place dependent on the DC voltage.
-
Next, the display shows ‘SYNC AC,’
the grid icon flashes.
-
Startup test:
Before the inverter starts feeding ener-
gy into the grid, the conditions of the
grid are tested in detail in accordance
with local regulations. The display
shows ‘START UP.’
-
Operation of feeding energy into the
grid:
After selecting the grid and when the
tests are concluded, the inverter starts
feeding energy into the grid.
The display shows the present power
feeding into the grid.
The Operating Status LED lights up
green, and the inverter starts opera-
ting.
IMPORTANT!
For more information about the startup phase, please see the chapter 'Op-
eration', section 'Product description Fronius IG' (Startup Phase, Test Procedure).
Содержание IG 2000
Страница 2: ...0...
Страница 4: ...2...
Страница 6: ...4...
Страница 10: ...8...
Страница 15: ...General Information...
Страница 16: ......
Страница 21: ...Installation and Startup...
Страница 22: ......
Страница 50: ...48...
Страница 51: ...Operation...
Страница 52: ......
Страница 80: ...78...
Страница 81: ...Troubleshooting and Maintenance...
Страница 82: ......
Страница 95: ...Appendix...
Страница 96: ......
Страница 113: ...111 EN US...
Страница 114: ...112...
Страница 115: ...113 EN US...