Startup Phase and Grid Feed-in Mode
Startup phase
The inverter carries out a self test after being turned on automatically. Then a test of the
public grid is carried out. This test takes five minutes. During the startup sequence the illu-
mination of the Operating Status LED is yellow.
Test procedure
1.
Segment test
All display elements light up for about one second
2.
Self test of essential inverter components
-
The inverter goes through a master check list for several seconds
-
The display shows ‘TEST’ and indicates the respective component that is being
tested (for example, ‘LED’)
3.
Synchronization with grid:
-
‘WAIT PS’ is displayed, the inverter icon flashes: The inverter is waiting for all
power stage sets in the network to be on stand-by. This procedure takes place
dependent on the DC voltage
-
Next, the display shows ‘SYNC AC,’ the grid icon flashes.
4.
Startup test
-
Before the inverter starts feeding energy into the grid, the conditions of the grid
are tested in accordance with local regulations.
-
The display shows ‘START UP.’
Содержание IG 2000
Страница 2: ...0...
Страница 4: ...2...
Страница 6: ...4...
Страница 10: ...8...
Страница 15: ...General Information...
Страница 16: ......
Страница 21: ...Installation and Startup...
Страница 22: ......
Страница 50: ...48...
Страница 51: ...Operation...
Страница 52: ......
Страница 80: ...78...
Страница 81: ...Troubleshooting and Maintenance...
Страница 82: ......
Страница 95: ...Appendix...
Страница 96: ......
Страница 113: ...111 EN US...
Страница 114: ...112...
Страница 115: ...113 EN US...