Rittal Liquid Cooling Package
3
Contents
Contents
Notes on documentation .................. 5
CE labelling ................................................... 5
Information on electromagnetic compatibility. 5
Storing the documents.................................. 5
Symbols in these operating instructions ........ 5
Other applicable documents ......................... 5
Normative instructions .................................. 5
1.6.1 Legal information concerning the operating
instructions ........................................................... 5
1.6.2 Copyright ............................................................. 5
Safety instructions ............................ 6
Important safety instructions ......................... 6
Service and technical staff ............................ 7
2.2.1 Personal safety equipment ................................... 7
Operator requirements .................................. 7
2.3.1 Abbreviated instructions ....................................... 7
2.3.2 System log ........................................................... 7
2.3.3 F-gas regulation ................................................... 8
2.3.4 Chemicals – Climate Protection Ordinance ........... 8
RoHS compliance ......................................... 8
Device description ............................ 9
General functional description ....................... 9
Air routing ..................................................... 9
3.2.1 General ................................................................ 9
3.2.2 LCP Rack DX ..................................................... 10
3.2.3 LCP Inline DX ..................................................... 11
Equipment assembly................................... 11
3.3.1 Unit components ................................................ 11
3.3.2 Coolant circuit .................................................... 12
3.3.3 External condenser ............................................. 12
3.3.4 Fan module ........................................................ 13
Proper and improper usage ........................ 13
Supply scope of a LCP DX.......................... 13
Transportation and handling ........... 14
Transportation ............................................ 14
Unpacking .................................................. 14
Assembly and siting ....................... 15
General ....................................................... 15
5.1.1 Installation site requirements ............................... 15
5.1.2 Prepare the installation room .............................. 16
5.1.3 Installation guidelines .......................................... 16
Assembly procedure ................................... 16
5.2.1 General .............................................................. 16
5.2.2 Fit the attenuators .............................................. 17
5.2.3 Dismantle the side panels ................................... 17
5.2.4 Seal the server enclosure .................................... 17
5.2.5 Installation and baying of the LCP DX ................. 18
5.2.6 Mounting the side panel ..................................... 19
External condenser ..................................... 19
Installation ...................................... 21
General ....................................................... 21
Notes on pipework...................................... 21
Connecting the condensate discharge ........ 24
Electrical connection .................................. 25
6.4.1 General .............................................................. 25
6.4.2 Connecting the LCP DX ..................................... 26
6.4.3 Connecting the external condenser .................... 26
Operation ....................................... 28
Control and display components................ 28
Switching the LCP DX on and off ............... 28
7.2.1 Switching on the LCP DX and the external
condenser .......................................................... 28
7.2.2 Switching off the LCP DX and the external
condenser .......................................................... 28
7.2.3 Switching off in an emergency ............................ 28
Layout of the user interface ........................ 28
General operating instructions.................... 28
Start screen ............................................... 28
Menu level A "On/Off Unit" ......................... 29
Menu level B "Setpoint".............................. 29
Menu level C "Clock/Scheduler"................. 30
Menu level D "Input/Output"....................... 30
7.10 Menu level E "Data logger" ......................... 30
7.10.1 Menu E01 .......................................................... 30
7.11 Menu level F "Board switch"....................... 30
7.12 Menu level G "Service" ............................... 31
7.13 Configure the pCO Web card ..................... 31
7.13.1 Activate the factory bootswitch parameters ........ 31
7.13.2 Logging on to the pCO Web card ....................... 31
7.13.3 Configure the network interface .......................... 32
7.13.4 E-mail configuration ............................................ 32
7.13.5 LCP DX supervisory table ................................... 33
Troubleshooting ............................. 37
General ...................................................... 37
Alarm relay circuit....................................... 37
List of error messages and solutions .......... 38