XLP3 EVAPORATIVE CONDENSERS

MAINTENANCE

• 

Rotation:

 Turn the fan by hand to ensure that it moves 

freely with no rough spots, binding, or other malfunctions 
that could cause vibration or fan motor overload. While 
rotating the fan, check the blade tracking. All blades should 
track within a 1/2” band at any single point around the 
cowl.

• 

Direction of Rotation:

 On initial start-up, or if the fan 

motor has been rewired, briefly energize the fan motor 
and note the direction of rotation. It should rotate in the 
direction indicated by the arrow on the fan cowl. On units 
with independent fan motors, check the rotation of each 
fan.

• 

Operation:

 On initial start-up, run the fan in the manual 

position for several minutes, and check for any unusual 
noises or vibrations.

NOTICE

Check to ensure the controls for the fan motor are set to 

allow a maximum of six on-off cycles per hour to prevent 

motor overload.

Drive System Inspection & Maintenance

The Belt Drive Fan System requires a periodic check of the belt 
condition and, when necessary, tension adjustment. The recom-
mended service intervals are as follows:

• 

Initial Start-up

:

 • 

Externally Mounted Motor:

 The motor base assembly 

has been pre-aligned at the factory. Mount the motor 
base assembly to the unit and verify alignment. Install 
the belt and follow the belt tensioning directions below.

 • 

Seasonal Start-Up:

 Readjust the belt tension (if 

required).

• 

Operation:

 After the first 24 hours of operation, readjust 

the belt tension on a new unit start-up or installation of a 
new belt. Thereafter, check the belt condition monthly, and 
adjust tension as necessary. Readjust tension at least once 
every three months.

• 

Belt tension check:

  •  Place a straight edge along the belt from sheave to 

sheave as shown in Figure 22a, or use a tape measure 
as shown in Figure 22b to measure belt deflection.

  •  Apply a moderate force by hand (approximately 40 

lbs/275 kPa) evenly across the width of the belt in the 
center of the span between the sheaves.

  •  There is adequate belt tension if the belt deflects 

between 1/4” and 3/8” as shown in Figures 22a and 22b.

Figure 22a — Belt Tension with a Straight Edge

Figure 22b — Belt Tension with a Tape Measure

•  

Belt tension adjustment (if required)

:

  •  Using a wrench or impact gun, turn the motor base 

adjusting screw (Figure 23) clockwise to tension the 
belt or counterclockwise to relieve belt tension. During 
adjustment of the belt tension, rotate the drives 
several times by hand to evenly distribute the tension 
throughout the belt.

Figure 23. Motor Adjusting Screw

Motor  

Adjusting 

Screw

NOTICE

If belts are properly tensioned, there should be no “chirp” 

or “squeal” when the fan motor is started.

•  Drive alignment check and adjustment:

  •  Place a straight edge across the driver and the driven 

sheaves as shown in Figure 24.

  •  The straight edge should contact all four points as 

shown in Figure 24 indicating that the drives are 
properly aligned.

  •  There should be no more than 1/16” deviation from the 

four points of contact.

  •  In case of realignment, loosen the driver sheave, and 

align it with the driven sheave. Allow 1/4” for draw-up 
as the bushing screws are retightened.

 

DANGER

Rotating equipment will cause severe personal injury or 
death to persons who come in contact. Do not perform any 
service on or near the fans, motors, and drives, or inside the 
unit without first ensuring that the fans and pump motors 

are disconnected, locked out, and tagged out.

Содержание XLP3

Страница 1: ...ive Condenser THIS MANUAL CONTAINS RIGGING ASSEMBLY START UP AND MAINTENANCE INSTRUCTIONS READ THOROUGHLY BEFORE BEGINNING INSTALLATION FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJU...

Страница 2: ...TIONS 14 START UP PROCEDURE 15 Considerations for Initial Start Up 15 General 15 Cleaning 15 Inspection 15 Start up 15 EXTENDED SHUTDOWN 16 PROLONGED OUTDOOR STORAGE 16 Storage Preparation 16 Motor Re...

Страница 3: ...afety Cage Optional Coil Connection Refrigerant Vapor In Coil Connection Refrig erant Liquid Out Terminal Box Pump Factory Pre Assembled Platforms with Perimeter Handrails Optional BranchLokTM Removal...

Страница 4: ...ellaneous parts are included with the shipment and where they are packed This envelope will be attached to the side of the unit or located in a box inside the unit INSTALLATION Unit Weights Before rig...

Страница 5: ...to ensure an airtight seal between the top and bottom section Install flat butyl sealer tape Frick part 554000 supplied with the unit on the mating flanges of the lower section in a continuous line A...

Страница 6: ...basin section sealer tape must be applied to both cross flanges see Figure 3 10 On units operating with a remote sump tank install a bleed line with valve between the system circulating pump discharg...

Страница 7: ...lease ensure that the correct voltage is supplied to the unit If unsure check your unit s submittal to verify that the provided power matches your unit On the factory terminal box remove the NEMA plug...

Страница 8: ...nd Figure 9 Detail A Check your submittal for the ladder orientation ordered Attach the ladder to the platform and fasten the lower and intermediate brackets to the ladder side rails as shown in Figur...

Страница 9: ...DENSERS INSTALLATION Figure 9 End Ladder Installation Detail A End Ladder Bracket Detail A Perimeter Guardrail Installation Detail B Corner Guardrail Installation Detail C Perimeter Guardrail Installa...

Страница 10: ...are provided for all handrail openings and all components are designed to meet OSHA requirements Share two lower fasteners on upper ladder bracket Upper ladder bracket Hoop Detail D Figure 11 Safety...

Страница 11: ...per the control panel wiring diagram 5 Connect the heater power wire conduit s to the heater power wire hub s provided on the control panel Make sure the con nection is watertight and secure Pull the...

Страница 12: ...Control Panel L1 L2 L3 Controller Liquid Level Temperature Combination Series TL Solitech CT N C NO NC T1 T2 G1 G2 Shielded Cable Assembly Sensor Probe Cord G2 G1 T2 T1 SH No 1 Heater 40 24 16 12 8 1...

Страница 13: ...ter basin a For connections 3 or less score the TripleGuard Corrosion Protection System with a hole saw as shown in Figure 14 b For connections 3 or greater proceed to step 4 4 Cut the hole from the o...

Страница 14: ...fan screens access panels and access doors in place CAUTION All electrical mechanical and rotating machinery are potential hazards particularly for those not familiar with their design construction an...

Страница 15: ...locked out and tagged out Inspection Conduct external inspection of the equipment Check for leaks corrosion and any structural damage Conduct internal inspection of the equipment Check for anything u...

Страница 16: ...fer to the manufacturer s guidelines before loading unloading weight from the unit Disconnect lock out and tag out the fans pump and motors Close the shut off valve in the make up water line supplied...

Страница 17: ...ump motors are disconnected locked out and tagged out Belt Drive Fan System Frick standard motors are designed for storage at ambient temperatures of 20 F to 104 F 28 9 C to 40 C Prolonged periods of...

Страница 18: ...system performance or create a safety hazard Fan Section Icing Protection There are three basic operational methods which can be used to provide the system s required cooling temperature setting fan...

Страница 19: ...heaters are sized for the specific unit The heating element has an enclosure that is suitable for outdoor use Annually inspect the basin heater prior to the risk of reaching freezing operating condit...

Страница 20: ...bration cutout switch is not needed Mechanical Vibration Cutout Switch Standard Set Point Adjustment When Installed 1 For safety turn off then lock and tag out the electrical supply to the fan motor s...

Страница 21: ...Control Panel L1 L2 L3 Controller Liquid Level Temperature Combination Series TL Solitech CT N C NO NC T1 T2 G1 G2 Shielded Cable Assembly Sensor Probe Cord G2 G1 T2 T1 SH No 1 Heater 40 24 16 12 8 10...

Страница 22: ...ent Staging Down Turn off the fan motor No need for delays NOTICE For a unit with a VFD with a switching frequency of 2 5 kHz the line lead length cannot exceed 100 feet If the switching frequency is...

Страница 23: ...the VFD on and verify that the fan is turning in the correct direction Using the VFD slowly about 1 RPM increase every five to ten seconds adjust the motor speed from the lowest limit to full speed wh...

Страница 24: ...tors are disconnected locked out and tagged out Blade Pitch Check to ensure that the blades are all at the same pitch If uncertain measure the pitch with an inclinometer All blades should be within 1...

Страница 25: ...s necessary Readjust tension at least once every three months Belt tension check Place a straight edge along the belt from sheave to sheave as shown in Figure 22a or use a tape measure as shown in Fig...

Страница 26: ...the bearings as follows Initial Start Up Normally no lubrication is required since the bearings have been lubricated at the factory prior to shipment However if the unit has been stored at the job si...

Страница 27: ...the valve seat if necessary Maintain the make up water supply pressure between 15 psig and 50 psig for proper operation Frick recommends a pressure regulator valve provided by others for pressures ove...

Страница 28: ...tection System for signs of deep scratches or blemishes especially in areas with field penetrations Touch these up with 3M Windo Weld Super Fast Urethane which is available through your local Frick Re...

Страница 29: ...Dissolved Solids TDS 1 500 ppm 2 050 ppm 2 050 ppm 2 500 ppm Conductivity 2 400 micromhos cm 3 300 micromhos cm 3 300 micromhos cm 4 000 micromhos cm Alkalinity as CaCO3 500 ppm 2 600 ppm 2 600 ppm 2...

Страница 30: ...methyl or ethyl alcohol or mineral spirits Stainless steel wipes or glass cleaners commonly available in stores may also be used NOTICE Never use chloride or chlorine based solvents such as bleach or...

Страница 31: ...reatment expert Bleed Line Calculations Bleed rate is determined by the fol lowing formula B E n 1 Where B Bleed Rate USGPM E Evaporation Rate USGPM Q USGPM x R F x 0 001 Q Process Fluid Flow Rate USG...

Страница 32: ...for proper rotation X Check general condition of the fan X X Check fan for uniform pitch 4 X Check fan for rotation without obstruction X X Check and recoat steel shafts with RUST VETO 4 X X X Check...

Страница 33: ...140 925 IOM APR 2019 Page 33 XLP3 EVAPORATIVE CONDENSERS MAINTENANCE NOTES...

Страница 34: ...ynesboro PA 17268 1206 USA Phone 717 762 2121 FAX 717 762 8624 www johnsoncontrols com frick Form 140 925 IOM 2019 04 Supersedes Nothing Subject to change without notice Published in USA 04 19 PDF 201...

Отзывы: