![Freestyle FS-120 LP Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/freestyle/fs-120-lp/fs-120-lp_instruction-manual_2330823032.webp)
Figure 36
"OILERTOPOPENINGOUTOFTHECARTON
Part number 550-142-850/0115
32
FreeStyle
™
W
ALL
M
OUNT
GAS
-
FIRED
WATER
BOILER
—
Boiler Manual
15
Vent and air piping and boiler connections
Follow termination instructions
1.
2EAD AND FOLLOW ALL INSTRUCTIONS FOR THE TERMINATION TYPE
USEDBEFOREPROCEEDINGWITHTHISPAGE&OLLOWALLINSTRUCTIONS
PROVIDEDBYVENTPIPEMANUFACTURER
5SEONLYMATERIALSFROMTHEMANUFACTURERSLISTED
in Figure 21, page 19.
Installing vent and air piping
For polypropylene applications, comply with any
additional requirements in the vent system manu-
FACTURERSINSTRUCTIONS
(Do Not use 3” PVC transi-
tion pieces at the boiler vent and air connections).
Provide 2” or 3” PVC transitions at the termination
IFUSINGA06#CONCENTRICVENTKIT)NSTALLALOCKING
collar at every joint.
For AL29-4C vent pipe applications, comply with
any additional requirements in the vent system
MANUFACTURERS INSTRUCTIONS
Provide a AL29-4C
STARTERPIECEFROMTHE!,#MANUFACTURERTOTHE
transition piece at the boiler vent connection. Air
piping must be PVC or CPVC. Connect to the boiler
air piping only with 3” PVC (use a transition piece
FORvAIRPIPE 0ROVIDEvORv06#TRANSITIONSAT
THETERMINATIONIFUSINGA06#CONCENTRICVENTKIT
1.
7ORK FROM THE BOILER TO VENT OR AIR TERMINATION $O NOT
EXCEEDTHELENGTHSGIVENINTHEPREVIOUSPAGESFOREITHERTHE
air or vent piping.
2.
"OILERHASTWO AIRINLETSLEFTANDRIGHTOFCENTEREDmUE
OPENINGPREDETERMINEWHETHERUSINGLEFTORRIGHTFORAIR
inlet piping.
3. See Figure 36,
FORLOCATIONSFORATTACHINGVENTANDAIRINLET
adapters on to the boiler. Air inlet adapter connection can
BEMADEONEITHERSIDEOFCENTEREDmUEADAPTER
Figure 37
&LUEANDVENTADAPTERSANDGASKETS
4. Remove vent/exhaust protective paper prior to mounting
vent adapter.
5. Vent adapters needed to be attached to top with gaskets
and screws, see Figure 37. Vent adapters (provided with
BOILER AREFORPOLYPROPYLENEVENTINGINSERT06#ADAPTERS
(supplied) into mounted vent adapter to vent with PVC.
6. See Figure 38, center flue gasket and insert the extruded flue
VENTADAPTERINTOTHECENTEROPENINGSECUREWITHFOUR
LARGE0HILLIPSHEADSCREWSONTHEOUTSIDESETOFHOLES
ONTHEVENTADAPTER4ESTPORTORIENTATEDTOFRONTOFBOILER
-USTBEINVERTICALPOSITIONANDLOCKEDCLOSED
7. See Figure 39, center air inlet gasket and air inlet vent adapter
OVERLEFTORRIGHTOPENINGSECUREWITHFOUR 0HILLIPS
HEADSCREWSONTHEINSIDESETOFHOLESONTHEVENTADAPTER4EST
PORTORIENTEDTOFRONTOFBOILER-USTBEINVERTICALPOSITION
and locked closed.
Figure 38
6ENTmUEADAPTERINTOTOPmUECENTEROPENING
&IGURE
6ENTmUE ANDAIRADAPTERSINPLACE
Vent pipe
connection
Air pipe
connections
vent/exhaust
LOCATION
Vent and Air adapters to be installed with test ports facing to
front of boiler. Must be in vertical position and locked closed.
Flue
adapter
Vent
adapter