9
2.3 Plumbing diagram for the unit
pic. 4
S1
CH PROBE
PR
CH PUMP
F
PRIORITY FLOW METER
BR
BURNER
S2
DHW PROBE
PS
DHW PUMP
TS
LIMIT THERMOSTAT
TA1
ROOM THERMOSTAT (OPTIONAL)
1
FLOW
G 3/4 M
2
DHW
G 1/2 M
3
RETURN
G 3/4 M
4
COLD WATER
G 1/2 M
fig. 3
D (mm)
CTF
150
CTFD
120
Air intake
TFD version
Fuel
supply
L (mm)
23
625
33
755
2.2 Dimensions
Содержание CAPRI C
Страница 1: ...CAPRI C IST 03 C 201 01 INSTALLATION USE AND MAINTENANCE GB...
Страница 21: ...21...
Страница 22: ...22...
Страница 23: ...23...