![Fondital CAPRI C Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/fondital/capri-c/capri-c_use-and-maintenance-instructions_2315340014.webp)
3.4 Starting up the heating unit
3.4.1 Preliminary checks
Before starting up the heating unit carry out the following checks:
- Make sure the flue gas discharge pipe and the air intake pipe are
installed correctly. When the heating unit is switched on, there
must be no leakage of combustion products from any of the
seals.
- Check that the supply voltage is 230 V - 50 Hz.
- Make sure the system is full of water (water pressure 0.8-1 bar);
- Make sure any cut-off valves in the CH and DHW systems are
open.
- Make sure the fuel supply tap is open.
- Switch on the main switch.
- Check that the safety valve is not blocked.
- Check for water leaks.
3.4.2 Switching on and off
For instructions on how to switch the heating unit on and off, refer
to the “User Manual”.
3.4.3 Burner regulation
After starting up the heating unit it is necessary to regulate the
burner setting (see par. 4.4).
3.5 Wiring diagram
14
pic. 5
M: Terminal board for connecion to power mains, room thermostat
M6: Telemetry connections
M1-M24: available connectors
M13: remote / zones connector
TA: room thermostat
FUSE: 2AF 250 VAC fuse
P3: boiler operating mode selector
P2: DHW temperature adjusting potentiometer
P1: CH temperature adjusting potentiometer
TIMER: Timer (optional)
SR: CH probe 10k A 25°C Ohm B =3435
SS: DHW probe 10k A 25°C Ohm B =3435
CM2 ON = temperature holding ON
CM2 OFF = temperature holding OFF
Содержание CAPRI C
Страница 1: ...CAPRI C IST 03 C 201 01 INSTALLATION USE AND MAINTENANCE GB...
Страница 21: ...21...
Страница 22: ...22...
Страница 23: ...23...