![Flottweg TRICANTER Z 8E Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/flottweg/tricanter-z-8e/tricanter-z-8e_operating-instructions-manual_2307730039.webp)
Flottweg
Safety instructions on operational breakdown
4.1/2
Deposits of whirling solids in the housing
Deposits of solids in the housing can build up until they
reach the rotating bowl and can heat up due to the
generated friction or even ignite.
This may lead to machine damage and risk to
employees.
Observe deposits and rinse regularly.
The tendency to form deposits depends on the product and must be observed upon
initial commissioning (for inspection open the housing).
To remove deposits it is necessary to carry out intermediate rinsing measures at regular
intervals during the operation.
Deposits of solids on the internal surface of the scroll pipe
Small portions of the fed product which are whirled about can be centrifuged at the
internal surface of the scroll and lead to deposits of solids.
Deposits of solids in the scroll interior will cause unbalances.
Strong unbalances may lead to machine damage and risk
to employees.
Observe deposits and rinse regularly.
The tendency to form deposits depends on the product and must be observed upon
initial commissioning (vibrations and noise).
To remove deposits it is necessary to carry out intermediate rinsing measures at regular
intervals during the operation.
Blockage
Blockage will lead to undesired operating conditions and switching-off due to scroll
overload and thus to machine/facility breakdown and product loss.
To avoid blockage, the machine is fitted with a system to monitor and control the scroll
torque.
If the torque increases, the differential speed will be increased at first. If the torque
continues to increase, the product feed will be interrupted, until the torque sinks again.
Should, nevertheless, the torque continue to rise, the machine will be stopped.
CAUTION
CAUTION
U
k_
4
_
1
_
2
-3
x8
-S
im
p
_
2
1
0
9
0
4
-P
re
-V
i_
w
o
h
Содержание TRICANTER Z 8E
Страница 5: ...Flottweg 1 GENERAL Uk1 allg_030107 Pre...
Страница 15: ...Flottweg 2 OPERATION Uk2 allg_030107 Pre...
Страница 24: ...Flottweg 3 LUBRICATION AND INSPECTION Uk3 allg_030107 Pre...
Страница 37: ...Flottweg 4 OPERATING TROUBLES Uk4_1 allg_030107 Pre...
Страница 44: ...Flottweg 5 TABLES AND DIAGRAMS Uk5 allg_030107 Pre...
Страница 46: ...Flottweg 6 APPENDIX Uk6 allg_030107 Pre...