Electrical / Preparing To Start The Pump

7

4. Connect the power supply wires to the pressure

switch as shown in Figure 7. 

You have just completed the wiring for your pump. 

PRIMING

Never run pump dry

. Running pump with-

out water may cause pump to overheat, damaging seal
and possibly causing burns to persons handling pump.
Fill pump with water before starting.

Never run pump against closed discharge.

To do so can boil water inside pump, causing hazardous
pressure in unit, risk of explosion and possibly scalding
persons handling pump.

1. Remove the priming plug from the priming tee and

fill the pump. Fill all piping between the pump and
the well and make sure that all piping in the well is
full. If you have also installed a priming tee in the
suction piping, remove the plug from the tee and fill
the suction piping.

2. Replace all fill plugs (use teflon tape). 
3.

Power on!

Start the pump. If you don’t have water in

2 minutes, stop the pump and remove the fill plugs.
Refill the pump and piping. You may have to repeat
this several times in order to get all the trapped air
out of the piping. A pump lifting water 25’ may take
as long as 15 minutes to prime.

4. After the pump has built up pressure in the system

and shut off, check the pressure switch operation by
opening a faucet or two and running enough water
out to bleed off pressure until the pump starts. The
pump should start when pressure drops to 30 PSI and
stop when pressure reaches 50 PSI. Run the pump
through one or two complete cycles to verify correct
operation. This will also help clean the system of dirt
and scale dislodged during installation.

Congratulations on a successful installation.

If you were unsuccessful, please refer to the
Troubleshooting section (Page 8) or call our customer
service technical staff at 1-800-365-6832.

For parts or assistance, call Flotec Customer Service at 

1-800-365-6832

Fill pump 
and piping 
through 
priming tee.

2351 0396 SIM

Figure 8 – Prime the Pump

Connect the green (or bare copper) 
ground wire to the green ground screw.

Motor wires 

connect here.

Power supply wires 

connect here. 

Connect one hot wire (black or red) to one 
of these screws (it doesn't matter which one).
Connect the white (neutral) wire 
to the other screw. 
Cap any remaining black or red wires. 

Clamp the power cable to prevent strain 
on the terminal screws.

Connect to 115 Volt only.

Figure 7 – Wiring Connections to 115 Volt Power Supply

Содержание FP4105

Страница 1: ...Operaci n Piezas Para mayor informaci n sobre el funcionamiento instalaci n o mantenimiento de la bomba Llame al 1 800 365 6832 Espa ol Paginas 18 25 2005 FP569 Rev 10 28 05 OWNER S MANUAL Shallow We...

Страница 2: ...ble Sump Pumps 3 Years Models FPSC2200A 10 and FPSC2250A 10 Pre Charge Water System Tank Models FPSC3200A 10 and FPSC3250A 10 5 Years Floodmate 7000 Model FP0S6000A Ironmate Model FPSC4550A Sewage Eje...

Страница 3: ...discharge pipe and tank connections WELL POINT DRIVEN POINT INSTALLATION FIGURE 1 1 Drive the well using drive couplings and a drive cap Drive fittings are threaded all the way through and allow the...

Страница 4: ...e fewest possible fittings especially elbows in the suction pipe The suction pipe should be at least as large as the suction port on the pump 2 Assemble a foot valve and suction pipe see Figure 3 Make...

Страница 5: ...when there is no water in the tank The pre charge should be 2 PSI less than the cut in setting of the pump s pressure switch Congratulations You have just completed the tank con nection for your jet...

Страница 6: ...r local building inspector for code information Connection Procedure Your Pressure Switch looks like one of those shown in Figure 7 Connect the power supply as shown for your type of switch 1 Connect...

Страница 7: ...fting water 25 may take as long as 15 minutes to prime 4 After the pump has built up pressure in the system and shut off check the pressure switch operation by opening a faucet or two and running enou...

Страница 8: ...ow well A deep well pump may be needed over 25 ft to water setup to deliver water to deliver water Pump does not Water level in well is lower than A deep well jet will be needed if your well is more t...

Страница 9: ...Box Base Gasket 1 111P1340 111P1340 9 Seal Plate and Motor 1 10 Seal Plate Insert 1 101P1290 101P1290 11 O Ring 1 111P0700 111P0700 12 Shaft Seal Complete 1 ZBR00010 ZBR00010 13 Impeller 1 731S5700 7...

Страница 10: ...sibles pour puits de 4 pouces Pompes submersibles de puisard de 1 2 ch 3 ans Mod les FPSC2200A 10 et FPSC2250A 10 R servoirs pr charg s de syst me d eau Mod les FPSC3200A 10 et FPSC3250A 10 5 ans Floo...

Страница 11: ...ncement et des chapeaux de battage Les rac cords d enfoncement sont filet s sur toute leur longueur ce qui permet aux extr mit s des tuyaux de venir en but e l une contre l autre de fa on que la force...

Страница 12: ...liser du ruban t flon ou de la p te pour raccords filet s base de t flon sur les raccords filet s Poser une cr pine autour du clapet de pied pour le prot ger contre les poissons les d chets etc voir l...

Страница 13: ...ession d enclenchement du manocontacteur de la pompe F licitations Le branchement de la pompe jecteur sur le r servoir est maintenant termin Pour rendre les raccords des tuyaux tanches N utiliser que...

Страница 14: ...t illustr 1 Brancher tout d abord le fil de mise la terre comme il est illustr la Figure 7 Ce fil de mise la terre doit tre un fil de cuivre massif dont le diam tre sera au moins aussi gros que le dia...

Страница 15: ...ne pompe aspirant de l eau 25 pieds s amorce 4 Apr s que la pression se sera accumul e dans le syst me et que la pompe se sera arr t e v rifier le fonctionnement du manocontacteur en ouvrant un ou deu...

Страница 16: ...la valve ne fuit pas utiliser une solution savonneuse pour cela et au besoin remplacer l obus de la valve Le niveau de l eau du puits est plus bas que celui estim La tuyauterie en acier le cas ch ant...

Страница 17: ...2 po NSPM 1 J43 13C J43 13C Bague de verrouillage de raccord 1 U36 112ZP U36 112ZP 8 Joint de la base de la bo te de c blage 1 111P1340 111P1340 9 Plaque d tanch it et moteur 1 10 Garniture de plaque...

Страница 18: ...UMP de 1 3 HP Modelo FP0S1775A 2 a os Sistema de bomba de sumidero de respaldo Modelo FP2800DCC Bombas de pozo sumergibles de 4 Bombas de sumidero sumergibles de 1 2 HP 3 a os Modelos FPSC2200A 10 y F...

Страница 19: ...ar est n roscadas a todo lo largo y permiten que los extremos de la tuber a empalmen para que la fuerza de perforaci n del mazo sea soportada por la tuber a y no por el enroscado Las conexiones ordina...

Страница 20: ...de tefl n especial para juntas de tuber as den las juntas roscadas de la tuber a Proteja la conexi n de la v lvula de retenci n de peces basura etc con la instalaci n de una malla de alambre a su alr...

Страница 21: ...i n de la bomba Felicidades Usted acaba de realizar la conexi n del tanque para su bomba tipo jet C mo sellar las juntas de tuber a Use solamente cinta de tefl n para hacer todas las conexiones roscad...

Страница 22: ...e corriente seg n se ilustra para su tipo de man stato 1 Conecte el cable de puesta a tierra primero seg n se ilustra en la Figura 7 El cable de puesta a tierra debe ser un cable de cobre macizo por l...

Страница 23: ...de agua de 25 4 Despu s de que la bomba ha producido presi n en el sis tema y est apagada verifique la operaci n del interruptor de presi n abriendo una llave o dos y dejando correr sufi ciente agua p...

Страница 24: ...ario El nivel del agua en el pozo profundo es menor que el que se calcul La tuber a de acero si se utiliz est corro da u oxidada ocasionando una fricci n excesiva El tama o de la tuber a es muy peque...

Страница 25: ...r 1 2 NSPM 1 J43 13C J43 13C Aro de fijaci n del conector 1 U36 112ZP U36 112ZP 8 Empaquetadura de la base de la caja de cables 1 111P1340 111P1340 9 Placa de estanquidad y motor 1 10 Inserci n de la...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...28...

Отзывы: