74
The various cleaning and sanitizing procedures for the FB 80FCB are arranged in this manual
according to when and how often the procedures need to be done. Use the following directory as a
quick reference to all the cleaning procedures within this operations manual.
SCHEDULED MAINTENANCE - page 22
9-Tube Assembly Parts
Syrup Lines - Internal
Syrup Bag Connectors
Syrup Bag Locks
Syrup Bag fitments
Door Spout Assembly and O-rings
Area Under the Cabinet
Inside the Cabinet
Keypad Mounting Bracket
Tube / Cable Casing Assembly
9-Tube Assembly Syrup Lines
The following schedule has been prepared as a reference for maintaining the wear items used with the
FB 80FCB system. Many factors affect the useful life of wear items including climate, store hours, store
traffic, sales volumes, etc. Therefore, each operator must determine an appropriate schedule for his or
her unique operation. Wear items should be checked frequently during opening and closing procedures
and replaced as needed.
The Spare Parts Kit should contain replacements for these wear items. Be sure to keep replacements in
stock inside the Spare Parts Kit for easy access.
DIRECTORY OF CLEANING PROCEDURES
PARTS REPLACEMENT SCHEDULE
Part No.
Part Description
Every 3
months
Every 6
months
Annually
FLAVOR BURST COMPONENTS
RUB 652-RSS
Smaller Syrup Port O-Ring
X
RUB 660
Larger Syrup Port O-Ring
X
RUB 601
Duckbill Check Valve
X
Содержание TS 80FCB
Страница 4: ...3 PAGE INTENTIONALLY LEFT BLANK...
Страница 7: ...6 General System Overview Figure 1...
Страница 13: ...12 Syrup Pump and Related Parts Figure 4...
Страница 15: ...14 Sanitizer Pump and Related Parts Figure 5...
Страница 17: ...16 Electronic Parts and Connections Figure 6...
Страница 36: ...35 PAGE INTENTIONALLY LEFT BLANK...