7.2 Commissioning, volume level and operating temperature
Note:
If a different fill level is required than the self-established minimum level after start (operational ready and installed top-up),
the vessel should be filled to reflect the minimum required level needed for the actual system temperature, after completing
the commissioning procedure on the control unit. For better understanding, study the diagrams below and the paragraph on
maintenance, vessel draining and re-filling later in this document.
*
*
*
*
Example 1
Max. design temp.:
50 °C
Max. fill level:
92 %
Water feed, top-up:
12 %
Min. design temp.:
10 °C
Example 3
Max. design temp.:
25 °C
Max. fill level:
92 %
Water feed, top-up:
12 %
Min. design temp.:
6 °C
Actual temperature [°C]
Actual temperature [°C]
Vessel
tar
get
volume
[%]
(contr
ol
unit
display)
Vessel
tar
get
volume
[%]
(contr
ol
unit
display)
Example 2
Max. design temp.:
80 °C
Max. fill level:
92 %
Water feed, top-up:
12 %
Min. design temp.:
10 °C
Example 4
Max. design temp.:
40 °C
Max. fill level:
92 %
Water feed, top-up:
12 %
Min. design temp.:
6 °C
Note:
For Flamcomat Starter vessels (reference C), handles a maximum filling level of 77%.
Fig. FM.037.V01.15