AP BIO
Commissioning and operation
400/500/1000/2400
FG-DC_10523-GB_AP Bio_IOM-R0-12/2020 • Subject to modifications
19
7
Commissioning and operation
7.1
Overview of the operating elements
7.1.1 Control panel elements
Fig. 7-1
Overview control panel
1: Display
2: Increase button
3: Decrease button
4: Mode setting button
5: On/Off button
ATTENTION
Damage to the unit!
The unit must not be operated until the proper function tests have been carried out.
Содержание AP BIO 1000
Страница 1: ...AP BIO 400 500 1000 2400 AIR PURIFIER INSTALLATION OPERATION AND MAINTENANCE MANUAL ...
Страница 30: ...Notes AP BIO 400 500 1000 2400 30 FG DC_10523 GB_AP Bio_IOM R0 12 2020 Subject to modifications ...
Страница 31: ...AP BIO Notes 400 500 1000 2400 FG DC_10523 GB_AP Bio_IOM R0 12 2020 Subject to modifications 31 ...