Step
1.
Remove contents from box, and
lay upper frame (tank assembly) on its
back.
Step 2.
Attach lower frame to upper frame
with center bolt (M10X90mm bolt and spring
washer) but do not tighten.
Step 3
.
Install left and right side bolts
(M10X90mm bolt and spring washer).
Tighten all three.
S-350 Assembly Instructions
Step 4.
Attach the footplate to the main
frame (M10X180mm bolt, M10 Nylock
nut and 2 washers). Caution: The foot-
plate is heavy, FDF recommends two
people for this portion of assembly.
Keep hands clear of pivoting parts
during assembly.
WARNING
Содержание Fluid FR S-350
Страница 1: ......
Страница 2: ...S 250 FR S 350 Owners Manual ...
Страница 21: ......
Страница 23: ......