• Close the DC disconnect switches
(15)
to supply the inverter
with input voltage from the photovoltaic generator or (only in case
PVS-100/120 PRE-CHARGE BOARD KIT is installed) close the
AC switch downstream of the inverter (and AC disconnect switch
(09)
for the -S2, -SX2, SY2 wiring box version) to supply the
inverter with AC grid voltage. In the pre-commissioning phase
the “Alarm” LED keeps quickly flashing, “Power” and “GFI” LEDs
are OFF.
ATTENTION –
A
This inverter can be powered both with DC
or (only in case PVS-100/120 PRE-CHARGE BOARD KIT is
installed) AC sources. In case of DC source is used, make
sure that irradiation is stable and adequate for the inverter
commissioning procedure to be completed.
• Manual claiming of the inverters:
The claiming process consists of indicating which inverters are to
be commissioned.
Claiming process can be executed by scanning the QR
codes (L) (printed on the Communication identification label)
of all the inverters being worked and putting the selected
inverters into the working list. Please insert in the list inverters
belonging to the same inverters family; no more than 40
inverters by time can be configured together.
SN WLAN: SSSSSSSSSS
PN WLAN:
.V2P
VKA
53.1
Mac Address:
AA:BB:CC:DD:EE:FF
PK: 0000 - 0000 - 0000- 0000
SN WLAN: SSSSSSSSSS
SN Wiring Box: ZZZZZZZZZZ
Remove and apply on the plant documentation
MAC: AA:BB:CC:DD:EE:FF
L
M
As an alternative of QR code scanning, claiming process can
be executed by selecting manually the SSIDs associated to the
Wi-Fi networks generated by each inverter to commission and
inserting Product key (M) when requested:
NOTE –
D
It’s required to digit also the dash “-” characters of
the Product Key in the password field.
NOTE –
D
The steps below are valid for executing any other
available funtionalities of the Installer for Solar Inverters
mobile APP.
• Select the WiFi network.
• Tap on “Enter Product Key”.