3.1 How to use HCK construction toolbox workbench 14
3.2 Power connection
14
3.3 Battery operation
15
3.4 Starting up
15
3.4.1 Adjust the position of displayer 15
3.4.2 Adjust the brightness of LCD backlight 16
3.5 Fiber prepare
16
1. Clean the fiber 16
2. Install the fiber heat-shrinkable tubing 16
3.Strip and clean the fiber 16
4.Cut the fiber 17
3.6 Splice operation 17
3.6.1 Put fiber 17
3.6.2 Check fiber 18
3.6.3 Splice
18
Chapter 4 Splice Procedure 19
4.1 Display effective splice procedure
19
4.2 Select splice procedure
20
4.3 General splice procedure 21
4.3.1 Prefusing
21
4.3.2 Splice 21
4.3.3 Splice process 21
4.4 Splice parameter of general splice process 22
6.1 Heating template 25
6.2 Select heating mode 25
6.3 Edit the heating mode 25
Chapter 6 Heating Mode 24
Chapter 5 Splice option 23