4. Commissioning
4-8
Festo P.BE-CPVSC-EN en 0112NH
Checking the valve-cylinder combination
Warning
Before checking the valve-cylinder combination:
– Make sure that nobody is in the danger zone.
Testing
Proceed as follows:
1. Switch on the compressed air supply.
2. Check the functioning and operation of each individual
valve-cylinder combination by actuating the manual over-
ride as shown in the following diagrams.
3. Make sure that all the valves are in their basic positions
before commissioning the valve terminal.
4. Switch off the compressed air supply after checking the
valves.
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...