4. Commissioning
4-3
Festo P.BE-CPVSC-EN en 0112NH
4.1
General instructions
Before commissioning
•
Switch off the power supply before connecting or discon-
necting plugs (otherwise this could lead to functional
damage).
•
Commission only a valve terminal which has been fitted
and wired completely.
•
Make sure that there is a sufficient supply of fresh air
(cooling) for the following operating conditions:
– when the maximum number of valves are fitted,
– when the maximum operating voltage is applied,
– when the solenoid coil is constantly under stress.
Warning
When pressurizing or re-pressurizing the valve terminal
under the following conditions:
– with the safety start-up valve (slow build up of pressure)
and
– when there are electric signals (e.g. after EMERGENCY
STOP).
•
Apply the auxiliary pilot air externally (3 to 7 bar).
You will then prevent the cylinder from extending or
retracting suddenly.
The auxiliary pilot air must be applied with a pressure of 3 to
7 bar immediately after being switched on, otherwise there is
no guarantee that the valve will switch directly (see diagram).
If the pressure is less than 3 bar, there may be a delay before
the valve is switched, in spite of an electric signal being pres-
ent. The slow increase in pressure of the complete supply
does not then affect the cylinder. Depending on the valve
function, the cylinder would extend or retract suddenly.
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...