3. Installation
3-7
Festo P.BE-CPVSC-EN en 0112NH
Basic information
Connecting
1. Push the tubing as far as possible over or into the tube
connection of the screw connector.
2. Pull locking ring
1
over the tube connection or tighten
locking screw
2
.
3. For reasons of clarity, group the tubing together with
– tube straps or
– multiple hose holders.
Removing
1. Loosen the locking screw or locking ring of the screw
connector.
2. Pull out the tubing.
3. Replace non-required screw connectors with blanking
plugs
3
.
Connecting
Removing
1
3
2
Fig. 3/1: Tubing variants
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...