
5. Maintenance and conversion
5-6
Festo P.BE-CPVSC-EN en 0112NH
4. Pull the component forwards so that it can be discon-
nected from the plug of the electric circuit. Then lift it up
slightly and pull it forwards away from the tie rod.
Fig. 5/2: Removing a component in a valve location
Fitting a component
Please note
The valve with the work connection sub-base is a unit
tested for leakage by Festo.
– Do
not
disconnect the screw connectors in the work
connection sub-base.
They guarantee that the unit does not leak.
Proceed as follows:
1. Make sure that the seals are correctly seated between the
components on the valve terminal. They must lie correctly
in the appropriate seal grooves.
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...