4. Commissioning
4-9
Festo P.BE-CPVSC-EN en 0112NH
Actuating the manual override with automatic reset
(non-locking)
Reaction of the valve
Use a screwdriver to carefully
press down the plunger of the
manual override as far as pos-
sible.
The valve:
– Moves to the switching
position
Hold the plunger of the manual
override pressed down.
– Remains in the switch
position
Release the plunger. The
spring resets the plunger of
the manual override to the
starting position.
– Moves back to the basic
position (
not with 5/2-way
double-solenoid valve,
Ident. Code J)
Caution
Before commissioning your machine/system:
•
Make sure that double-solenoid valves (Ident. Code J)
are in their basic positions again. To do this actuate
manual override 12 of the relevant valve or apply current
to pilot solenoid 12.
•
Bring the locking manual override actuations into the
basic position again.
In this way you will avoid undefined switching states when
commissioning the machine/system.
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...