5. Maintenance and conversion
5-7
Festo P.BE-CPVSC-EN en 0112NH
Please note
When fitting the double-solenoid valve (Ident. code J), note
the correct position of the control and work valves.
– - The control valve must be on the left of the work valve.
You will then guarantee correct operation of the double-
solenoid valve.
2. If you wish to add a double-solenoid valve, you must re-
move two other components for each double-solenoid
valve.
3. Place the component on the tie rod. Press against the
component so that it snaps into position in the electric
circuit link.
Fig. 5/3: Fitting a component in a valve location
4. Align the CPV-SC valve terminal components on a flat sur-
face so that they are not offset.
5. Tighten the tie rods with 0.8 + 0.2 Nm.
Содержание Smart cubic CPV-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0112NH...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0112NH...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0112NH Chapter 1...
Страница 20: ...1 Summary of components 1 8 Festo P BE CPVSC EN en 0112NH...
Страница 21: ...Fitting 2 1 Festo P BE CPVSC EN en 0112NH Chapter 2...
Страница 26: ...2 Fitting 2 6 Festo P BE CPVSC EN en 0112NH...
Страница 27: ...Installation 3 1 Festo P BE CPVSC EN en 0112NH Chapter 3...
Страница 43: ...Commissioning 4 1 Festo P BE CPVSC EN en 0112NH Chapter 4...
Страница 57: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0112NH Chapter 5...
Страница 65: ...Technical appendix A 1 Festo P BE CPVSC EN en 0112NH Appendix A...
Страница 75: ...Index B 1 Festo P BE CPVSC EN en 0112NH Appendix B...
Страница 76: ...B Index B 2 Festo P BE CPVSC EN en 0112NH Contents B Index B 1...