Festo — SFAB-...-PNLK — 2022-08
Commissioning
17
6.2
Installation, electrical
WARNING
Risk of injury due to electric shock.
• For the electrical power supply, use only PELV circuits in accordance with IEC 60204-1/EN 60204-1
(Protective Extra-Low Voltage, PELV).
• Observe the general requirements of IEC 60204-1/EN 60204-1 for PELV circuits.
• Only use voltage sources that ensure a reliable electric separation from the mains network in
accordance with IEC 60204-1/EN 60204-1.
1. Observe signal line length
2. Configure binary outputs according to the wiring.
–
Tightening torque for the union nut at the plug connector: max. 0.3 Nm
Plugs
Pin
Wire colour
1)
Allocation
M12, 5-pin
1
Brown (BN)
Operating v24 V DC
2
White (WH)
Electrical output 2 (OutB or analogue)
3
Blue (BU)
Operating voltage 0 V
4
Black (BK)
Electrical output 1 (OutA, pulse, C/Q line with
IO-Link)
5
Grey (GY)
NC
1) When using the connecting cable from the accessories.
Tab. 10: Pin allocation
Circuit diagram
Fig. 10: Circuit diagram
7
Commissioning
7.1
Switching on the sensor in RUN mode
•
Switch on the operating voltage.
Ä
The current measured value is displayed. The sensor is in the basic status.
The sensor is in the basic status in RUN mode. The sensor shows the current measured values. The
basic status can be reached as follows from other modes:
–
Press and hold the [Edit] key for 3 seconds.
–
Expiration of monitoring time (timeout).