Festo — MSE6-E2M — 2022-08d
Commissioning
53
RJ45 bushing
Pin
Signal
Explanation
8
n.c.
Not connected
Housing
Shield/FE Shield/functional earth
Tab. 38: Pin allocation of the network interfaces RJ45, PROFINET
Connecting the energy efficiency module to the network
1. Connect the bus node to the network with the NECU-MS-D12G4-C2-ET or FBS-RJ45-PP-GS con-
nector.
2. Seal the unused connections with cover caps or blanking plugs to achieve the specified degree of
protection.
8.6.4
Setting DIL switches
You can set the following parameters with the DIL switches:
–
The operating mode. The energy efficiency module only supports the Remote I/O operating mode in
conjunction with the bus node CPX(-M)-FB44.
–
The diagnostics mode.
1
2
3
Fig. 28: DIL switches on bus node CPX-M-FB44
1
DIL switch 1: operating mode
2
DIL switch 2: diagnostic mode
3
Memory card
1. Switch off the power supply.
2. Unscrew the retaining screws of the cover.
3. Remove the cover
è
2 DIL switches are visible.
4. Use DIL switch 1 to set the operating mode.
5. Set the diagnostic mode with DIL switch 2.
6. Fit the cover.
7. Tighten the retaining screws of the cover. Tightening torque: 0.4 Nm ± 10 %.
Содержание MSE6-E2M
Страница 1: ...MSE6 E2M Energy efficiency module Operating instruc tion 8163321 2022 08d 8163323...
Страница 83: ......