Commissioning
© Festo Didactic • MPS
®
PA Compact Workstation
57
5.6.2
Float switch S111/S112/S117
The float switch is to be fitted into the tank. The float switch opens if the maximum
level of liquid in the tank is exceeded and switches off the pumps via the relay.
Prerequisites
•
The tank is mounted
•
Electrical connection of the float switch is established
•
The power pack is switched on.
Procedure
1.
The float switch is to be fed from the inside of the tank through the opening in
the tank cover an.d the screw tightened externally.
2.
Connect the float switch. The switch must emit a signal without any liquid.
3.
Fill the tank and establish whether the float switch interrupts the signal if the
maximum liquid level is exceeded. The float must turn upwards
4.
Check the positioning and setting of the sensor by repeated filling and emptying.
Note
Make sure that the flow always moves freely and is not stuck due to dirt.
Содержание MPS PA Compact
Страница 1: ...MPS PA Compact Workstation EN 12 08 Process automation MPS PA Compact Workstation Manual ...
Страница 10: ...Introduction 10 Festo Didactic MPS PA Compact Workstation ...
Страница 14: ...Technical data 14 Festo Didactic MPS PA Compact Workstation ...
Страница 16: ...Transport Unpacking Scope of delivery 16 Festo Didactic MPS PA Compact Workstation ...
Страница 68: ...Commissioning 68 Festo Didactic MPS PA Compact Workstation ...
Страница 70: ...Maintenance 70 Festo Didactic MPS PA Compact Workstation ...