Commissioning
40
© Festo Didactic • MPS
®
PA Compact Workstation
The MPS® PA Compact Workstation is generally delivered
•
completely assembled
•
operationally adjusted
•
commissioned
•
tested
The commissioning is normally limited to a visual check to ensure correct tubing
connections / pipe connections / wiring and supply of operating voltage.
All components, tubing and wiring is clearly marked so that all connections can be
easily reestablished.
The following is required to commission MPS® PA Compact Workstation:
•
The assembled and adjusted MPS® PA Compact Workstation
•
A control console
•
A PLC board or controller device
•
A power supply unit 24 V DC, 4.5 A
•
A compressed air supply of 6 bar (600 kPA), approx. suction capacity of 50 l/min
•
A PC with installed PLC programming software
A visual check must be carried out before each commissioning!
Prior to starting up the station, you will need to check:
•
The electrical connections
•
The correct installation and condition of the pipes and pipe connections
•
The correct installation and condition of the compressed air connections
•
The mechanical components for visual defects
(tears, loose connections etc.)
Eliminate any damage detected prior to starting up the station!
5.1
Workstation
5.2
Visual check
Содержание MPS PA Compact
Страница 1: ...MPS PA Compact Workstation EN 12 08 Process automation MPS PA Compact Workstation Manual ...
Страница 10: ...Introduction 10 Festo Didactic MPS PA Compact Workstation ...
Страница 14: ...Technical data 14 Festo Didactic MPS PA Compact Workstation ...
Страница 16: ...Transport Unpacking Scope of delivery 16 Festo Didactic MPS PA Compact Workstation ...
Страница 68: ...Commissioning 68 Festo Didactic MPS PA Compact Workstation ...
Страница 70: ...Maintenance 70 Festo Didactic MPS PA Compact Workstation ...