40 / 48
Festo 07DGC-Ga_en
Insert the spring pins between the slide and the slide-piston connection as
•
far as they will go.
Note
When inserting the spring pins, make sure that they rest properly in the
fixture.
The openings of the spring pins must be off-set by 90° to the join between
the slide and the slide-connection.
Align the upper edge of the slide-piston connection so that it is flush with
•
the outer edge of the slide using a stop. The parallel offset between the
upper edge of the slide-piston connection and the outer edge of the slide
must not exceed
0.5 mm.
max. 0.5 mm
Tighten the socket head screws for the slide-piston connection using the
•
appropriate torque (see table).
Type
Torque
DGC-50-…-G
20 Nm ±20%
DGC-63-…-G
20 Nm ±20%
Tighten the socket head screw on the right-hand end of the slide-piston
•
connection using the appropriate torque (see table).
Type
Torque
DGC-50-…-G
20 Nm ±20%
DGC-63-…-G
20 Nm ±20%
Tighten the threaded pins on the left-hand end of the slide-piston connection
•
using the appropriate torque (see table).
Type
Torque
DGC-50-…-G
5 Nm ±20%
DGC-63-…-G
5 Nm ±20%
Grease the sealing ring and insert it into the respective fixture in the end
•
cap.
Attach the respective end caps to the cylinder barrel on both sides and align
•
each rear and lower edge flush with the cylinder barrel.
Содержание DGC G Series
Страница 1: ...Repair instructions en Linear drive DGC G 7DGC Ga_en...
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ...Repair instructions en Linear drive DGC GF 7DGC GFa_en DG C 2 5 330 GF PPV A 123 456 W7 08...
Страница 91: ......
Страница 92: ......
Страница 93: ...Repair instructions en Linear drive DGC KF 7DGC KFa_en...
Страница 136: ......