4
Commissioning
36
Festo – GDCP-CAMC-G-S1-EN – 1412b – English
4.4
Function test, validation
Note
The STO function must be validated after the installation and after changes to the
installation.
This validation must be documented by the person performing commissioning. To assist
you with the commissioning, questions for risk minimisation are summarised below in
the form of sample checklists.
The checklists below are no substitute for safety training.
No guarantee can be provided for the completeness of the checklist.
No.
Questions
Correct
Com
pleted
1.
Were all operating conditions and interventions taken into
account?
Yes
0
No
0
0
2.
If the 3-step method for risk minimisation was applied,
i. e. 1. Inherently safe design, 2. Technical and possibly additional
safety measures, 3. User information on the residual risk?
Yes
0
No
0
0
3.
Were the hazards eliminated or the hazard risk reduced as far as
practically possible?
Yes
0
No
0
0
4.
Can it be guaranteed that the implemented measures will not
pose new hazards?
Yes
0
No
0
0
5.
Have the users been adequately informed and warned about the
residual risks?
Yes
0
No
0
0
6.
Can it be guaranteed that the operators’ working conditions have
not deteriorated due to the safety measures taken?
Yes
0
No
0
0
7.
Are the safety measures taken mutually compatible?
Yes
0
No
0
0
8.
Was adequate consideration given to the potential consequences
of using a machine designed for commercial/industrial purposes
in a non-commercial/industrial area?
Yes
0
No
0
0
9.
Can it be guaranteed that the implemented measures will not
severely impair the machine’s ability to perform its function?
Yes
0
No
0
0
Tab. 4.4
Questions for validation in accordance with EN ISO 12100-1:2010 (example)