2.1 Section Overview
This section describes the procedures required for installation the CV-6SLX power supply. The
topics covered are:
Section 2.2 List of Components and Cables Supplied with the Unit
Section 2.3 Rack Mounting the Power Module (HVPS)
Section 2.4 Mounting the Filament Power Supply Module(s)
Section 2.5 Grounding Requirements
Section 2.6 Cable Installation
Section 2.6.1 Connecting the Input Power Cables
Section 2.6.2 Connecting the HV Coaxial Cable(s) (PN 0620-8684-1)
Section 2.6.3 Connecting the HV Output Conduit(s) (PN 0620-9654-1)
Section 2.6.4 Connecting the Control/Data Cables
Section 2.6.5 Making I/O Connections to the Vacuum System
CAUTION
Before beginning the installation procedure, make sure that the facility circuit breaker supplying
power to the CV-6SLX is switched OFF and locked out with an appropriate lockout/tagout device.
Also make sure that the FPS ON/OFF switch and the circuit breaker switch (labeled
AC MAINS
)
on the HVPS front panel are both in the OFF position. The facility breaker must remain locked and
tagged out during the entire installation procedure. Likewise, the power module’s main circuit
breaker switch and the FPS ON/OFF switch must both remain in the OFF position during the
entire installation procedure. The power-up procedure (see section 3.4) specifies the exact
sequence in which power should be applied to the unit.
Содержание Temescal CV-6SLX
Страница 4: ...CV 6SLX User Manual ii 0101 8242 0 Rev C...
Страница 16: ...1 5 TemEBeam Controller EBC Section 1 Introduction to the CV 6SLX CV 6SLX User Manual 0101 8242 0 Rev C 1 4...
Страница 34: ...2 6 Cable Installation Section 2 Installation CV 6SLX User Manual 0101 8242 0 Rev C 2 18...
Страница 90: ...5 5 FPS Fuse Replacement Procedure Section 5 Troubleshooting CV 6SLX User Manual 5 32 0101 8242 0 Rev C...
Страница 92: ...Appendix A Pinout Table for Rear Panel Diagnostic Port J3 CV 6SLX User Manual A 2 0101 8242 0 Rev C...