![ferrotec Temescal CV-6SLX Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ferrotec/temescal-cv-6slx/temescal-cv-6slx_user-manual_2282280020.webp)
2.5 Grounding Requirements
Section 2: Installation
CV-6SLX User Manual
0101-8242-0, Rev. C
2-4
Figure 2-2 Facility Low Impedance Grounding Requirements
The installation of twin rods of copper-clad steel is preferred. However, if the equipment is to
be installed on the upper floors of a building, the system can be grounded by connecting the
vacuum chamber to the steel structure of the building. Where copper straps are attached to
frame members, the copper must be bolted to clean, bare patches of metal. The length of
copper strap connected to the source tray must be securely bolted to a clean site on that part.
CAUTION
Do not use braided wire for any ground connections.
CAUTION
Do not rely on water pipes to establish the system ground connection. Multiple
plumbing joints, each with tape and/or sealing compounds, make such a ground
unreliable.
Содержание Temescal CV-6SLX
Страница 4: ...CV 6SLX User Manual ii 0101 8242 0 Rev C...
Страница 16: ...1 5 TemEBeam Controller EBC Section 1 Introduction to the CV 6SLX CV 6SLX User Manual 0101 8242 0 Rev C 1 4...
Страница 34: ...2 6 Cable Installation Section 2 Installation CV 6SLX User Manual 0101 8242 0 Rev C 2 18...
Страница 90: ...5 5 FPS Fuse Replacement Procedure Section 5 Troubleshooting CV 6SLX User Manual 5 32 0101 8242 0 Rev C...
Страница 92: ...Appendix A Pinout Table for Rear Panel Diagnostic Port J3 CV 6SLX User Manual A 2 0101 8242 0 Rev C...