27
02
Weight Mount Installation
(Ferris IS3000ZF & IS3000ZX Series & Derby Stallion ZT2561F / 3-Bag System & E-Z Dump System)
Figure 45. Hole Location
Figure 46. Weight Rack Installation
Figure 47. Weight & Retainer Rod Installation
5”
(12,7cm)
1-1/4”
(3,18cm)
Install Weight Mount Rack
1. Measure and mark the front main frame tubes to the
dimensions shown in Figure 45.
2. Using a 3/8” drill bit, drill one (1) hole in each of the
main frame tubes from the outside surface of the
tube.
3. Slide the weight mount rack into the main frame
tubes and align with the holes drilled through the
frame (see Figure 46). It may require you drive the
arms into the frame tubes using a wooden block and
hammer.
4. Finish drilling through the opposite wall of the frame
tubes using the weight rack as a guide.
5. Install the 3/8” bolts from the inside of the frame rail
and fasten securely with the nylon lock nuts.
6. Install the counter weights supplied with the grass
collector on the weight mount rack (see Figure 47).
NOTE: Three (3) counterweights for the 3-Bag system,
two (2) counterweights for the E-Z Dump system.
7. Install the weight retainer rod through the weight
mount rack and secure with the hairpin clips (see
Figure 47).
Содержание 46764
Страница 2: ...THIS PAGE INTENTIONALLY BLANK ...