18
E-Z Dump Box & Mount Installation
02
Figure 29. Box Pivot Installation
A.
Base Pivot Mount
B.
Pivot Bracket
C.
Carriage Bolts and Flange Nuts
Install Box Pivots
1. Using a 25/64” drill, use the lower set of holes as a
guide and drill through the aluminum box.
2. Install the pivot brackets (B, Figure 29) on the base
pivot mount (A) in the position shown and secure
with the carriage bolts and flange nuts.
3. Install the base pivot mount assembly onto the box
frame in the holes previously drilled and secure with
the carriage bolts and flange nuts (C).
Install the Box Handle
1. Install the box handle (A, Figure 30) through the
latch bracket.
2. Install the 3/8-16 x 1-3/4” bolt (B) through the handle
and install one flange nut with the flange facing away
from the handle. Leave approximately 1” (2,54cm)
between the flange nut and the head of the bolt to
allow the handle to pivot freely. Install the handle to
the box and secure with a flange nut.
3. Install the handle spring (C) by hooking the round
end in the latch bracket and inserting the square end
into the handle tube.
Figure 30. Box Handle Installation
A.
Box Handle
B.
Bolt & Flange Nut
C.
Handle Spring
A
C
A
B
B
B
C
C
Содержание 46764
Страница 2: ...THIS PAGE INTENTIONALLY BLANK ...