background image

35

6.2 DISPLAY SCREEN 2

Below  is    the home  screen   2,  which  is  accessed by    swiping  the  main  screen  to  the  left. On this screen the  boiler 

operation   LEDs are shown on

08:36 Thu 09 Sep 2021

Resistance

Valve

Output Aux3

Thermostat 

Environment

Switch Flow

External Chrono

Output V2

Endless

Pump

Output Aux2

Lack of Pellet

2

V2

R

3

 7. OPERATION AND USE OF THE BOILER

7.1 TIPS AND WARNINGS

• 

Before   turning on  the    boiler,  make sure    that  inside  or  near      the    boiler  there is  no  flammable  material

• 

or that it could go into combustion.

• 

Use the fuel recommended by the manufacturer. 

• 

Do not use the boiler as an incinerator or otherwise than the use for which it is designed.

• 

The external surfaces    of  the  boiler    reach  high temperatures    for  touch,      so  precautions  should  be  taken

• 

suitable to avoid burns.

• 

Refer to this manual whenever you have any questions. Do not tamper with the display  until you are sure  which  procedure 
to  follow.

• 

Pay special  attention  to  the  alarms  and  messages  that are displayed   on the  display, it is  even  advisable  to take  
note  of them, in this way we will facilitate the work of the Technical Service in case of  intervention.

• 

Before turning on the boiler you should check that: there is nothing obstructing the air inlet tube, the burner is clean, the 
ashtray in place and the front door that gives access to the combustion chamber tightly closed. 

The door can only be 

opened when the boiler is stopped and  cold. 

• 

Do not touch the boiler with wet hands since it is an electrical appliance.

• 

Whenever you have any questions, consult this manual thoroughly. Do not manipulate  the display until you are sure that 

you have assimilated  what  procedure you should follow, the effect it produces on the operation and know how to reverse 

it if  necessary.

• 

Poor  handling  of  the  boiler  or    insufficient  maintenance  (not as   indicated  in  this  manual), can cause harm to people, 

animals, etc. In that case the manufacturer shall be exempt from all civil and criminal liability.

Содержание HIDROMATIC

Страница 1: ...Calidez de Vida hIDROMATIC AUTOMA TIC PELLET BOILER COD 0503 R1 INGL S...

Страница 2: ...2...

Страница 3: ...the extraordinary feeling of warmth in complete safety Please read this manual carefully as it contains important instructions regarding safety in installation use and maintenance This manual together...

Страница 4: ...CIPLES 17 5 4 2 CALCULATION OF THE SMOKE OUTLET PIPE 18 5 4 3 INSTALLATION IN TRADITIONAL TYPE CHIMNEYS 19 5 4 4 OUTER SECTION OF CHAMIN 19 5 4 5 TERMINATION OF THE SMOKE OUTLET 19 5 5 VENTILATION AND...

Страница 5: ...LE 32 6 2 DISPLAY SCREEN 2 35 7 BOILER OPERATION AND USE 35 7 1 ADVICE AND WARNINGS 35 7 2 FUEL LOADING 36 7 3 STARTING UP 36 8 CLEANING AND MAINTENANCE 37 RESET SERVICE 37 9 PROBLEMS MESSAGES AND ALA...

Страница 6: ...and 5 so that you can easily find the section to consult to solve the questions and doubts that may arise When we read or consult this manual we will consider that Special attention should be paid to...

Страница 7: ...tual is excluded for damage caused to people animals or things due to installation adjustment and or maintenance errors This boiler should only be used for what it has been expressly intended for Cert...

Страница 8: ...ified and or unskilled personnel Use not in accordance with security policies Modifications and repairs not authorized by the Manufacturer performed to the equipment Use of non original or unspecified...

Страница 9: ...m3 N 11 99 5 21 Average concentration of particles at 10 OR2 at rated power mg m3 N 15 79 17 07 Performance at minimum useful power 96 96 CO concentration at 10 O2 at minimum power mg m3 N 123 43 173...

Страница 10: ...wer mg m3 N 10 92 10 39 7 42 Average concentration of particles at 10 OR2 at rated power mg m3 N 19 11 19 88 18 88 Performance at minimum useful power 95 97 96 CO concentration at 10 O2 at minimum pow...

Страница 11: ...11 1503 1503 930 93 177 252 100 6 0 605 837 837 622 622 837 1603 702 1603 702 60 120 240 367 93 1030 684 837 MODEL HIDROMATIC 12 18 KW MODEL HIDROMATIC 24 30 35 KW...

Страница 12: ...the Austrian standard norm M7135 one of the most restrictive standards on the market ENplus is also issued by an institute that certifies that the pellet complies with the EN 14961 2 standard Main re...

Страница 13: ...FOR THE PRODUCT The use of inadequate fuel causes Accumulation of pellet in the burner Dirt on the burner and smoke evacuation ducts Bad combustion Decreased boiler performance Increased fuel consump...

Страница 14: ...the responsibility of the end user in accordance with the relevant laws to store dispose of and eventually recycle the packaging 5 2 LOCATION The boiler will be installed so that it is not necessary t...

Страница 15: ...mp connected to the drainage network The boiler should not be installed in rooms or areas where flammable or explosive products can be stored The installation of the boiler must ensure that the hydrau...

Страница 16: ...mable or heat sensitive coatings are in place Periodic cleaning of the boiler and the smoke ducts must be carried out since the soot and other accumulated combustion residues could enter into combusti...

Страница 17: ...ality The internal section of the smoke evacuation duct should be uniform and preferably circular In the event that we had a square or rectangular section the edges should be rounded with a minimum ra...

Страница 18: ...allowed for vertically installed duct has been calculated with a maximum of two 90 bends and practically no horizontal section only to cross the wall if necessary If the installation is different from...

Страница 19: ...for periodic maintenance The chimney must go up to the summit and the requirements of section 5 3 must be met Log cleaning Door access to the registry Max 250 mm Cap 120 mm Insulator Log cleaning Ins...

Страница 20: ...of maximum intake air of the apparatus Collective ventilation ducts are prohibited The air intake must be placed respecting at least 500 mm both horizontally and vertically from the smoke outlet The...

Страница 21: ...ith a closed expansion vessel The expansion vessel incorporated in the boiler does NOT guarantee adequate protection from thermal expansions suffered by water throughout the installation Therefore it...

Страница 22: ...tion phenomena The water characteristics on the installation are very important for the proper functioning and duration of the boiler One of the most notable drawbacks is the fouling on the heat excha...

Страница 23: ...tional pressure Automatic adaptation for constant pressure Proportional pressure 1 Proportional pressure 2 Proportional pressure 3 max Constant pressure 1 Constant pressure 2 Constant pressure 3 max C...

Страница 24: ...or sharp parts that may deteriorate it The power outlet must be single phase with phase neutral and grounding If the mains voltage is not sinusoidal such as generator sets or other equipment the boil...

Страница 25: ...ich is fully tactile 08 36 Thu 09 Sep 2021 KEY FUNCTION DESCRIPTION P1 ON OFF With this button we proceed to the on off the boiler P2 CONFIGURATIONS Through this key you access the menu settings both...

Страница 26: ...09 Sep 2021 P4 Power Season Winter Operation Chrono Pellet OFF From this main screen if we want to see the history of errors that the boiler has we press the Button I of error information as shown be...

Страница 27: ...p 2021 Next the device goes to the power on phase where the first screen we will see is the CHECK UP status as indicated in the following image 08 36 Thu 09 Sep 2021 OFF In the same way is the procedu...

Страница 28: ...of working the boiler Endless calibration and fan calibration are two options that we do not recommend using since the boiler is configured from the factory and designed so that by the Conforluxsyste...

Страница 29: ...e has been done we stop the counter and proceed to the ignition Manual loading of the auger should also be done when the hopper has completely run out of fuel or when cleaning and maintenance is done...

Страница 30: ...shown in the sequence of images below Keyboard Settings Date and time Language 11 35 Thu 07 Oct 2021 Date and time 0 9 3 3 0 5 A g o 2 0 1 9 1 0 3 4 0 6 S e p 2 0 2 0 1 1 3 5 0 7 O c t 2 0 2 1 1 2 3...

Страница 31: ...ghtness Standby screen Screen Saver Control panel address In this screen you can set up customize the appearance that you want our control panel to present 6 1 4 INFORMATION In this section we access...

Страница 32: ...low we show the daily schedule which we will choose if what we need is a different on and off for each day of the week DAILY PROGRAMMING You can program the boiler for any of the week days With the op...

Страница 33: ...ng hours of the boiler WEEKLY PROGRAMMING The boiler can be programmed only once for all days of the week With the option of three non matching time slots for on and off that is three different non ma...

Страница 34: ...have three time slots for each modality WEEKEND PROGRAMMING You can schedule the boiler only once for all days of the week from Monday to Friday and another different schedule for the end of week With...

Страница 35: ...ou are sure which procedure to follow Pay special attention to the alarms and messages that are displayed on the display it is even advisable to take note of them in this way we will facilitate the wo...

Страница 36: ...mmends always having it at least half load After a long period of inactivity it will be necessary to remove the remains of pellets from the fuel tank since these could have absorbed moisture changing...

Страница 37: ...while we have an error on the screen we will not be able to start the boiler 8 CLEANING AND MAINTENANCE For the proper functioning of the boiler it is essential to carry out certain maintenance tasks...

Страница 38: ...sional or S A T authorized to perform IT if they have not been recently carried out the maintenance work that is marked in the table shown below LACK OF CLEANLINESS COMPROMISES THE SAFETY AND PROPER F...

Страница 39: ...f the problem continues plese call the Technician The screen does not turn on Check that the voltage reaches the plug see if the back switch is on the switch fuse may be blown etc 9 2 MESSAGES MESSAGE...

Страница 40: ...the status Lock ALARM CODE DESCRIPTION POSSIBLE CAUSE SOLUTION Er01 Body Temperature Safety Thermostat Intervention There has been a prolonged power outage Water does not circulate correctly through t...

Страница 41: ...correct operation Missing or damaged smoke probe Check the condition of the boiler and do cleaning if necessary In case of repeating this alarm often and or not being able to reset it notify the S A...

Страница 42: ...e hopper and the pellet does not reach the endless The load auger has been stuck and or charging motor does not rotate IF THE BRAZIER HAS BEEN LEFT FULL OF PELLET urns burned Wet or poor quality pelle...

Страница 43: ...mum airflow has not been reached during the Check up check We could have a problem in the smoke outlet The air inlet is totally or partially plugged or has been channeled and has a lot of pressure los...

Страница 44: ...44 Error 12 Power Failure Slide to Unlock When this message is displayed in the control panel the boiler is ready to unlock and restart Slide as indicated on the screen and unlock...

Страница 45: ...ville Tel fono telefone telephone t l phone Pa s pais country pays VENDEDOR VENDEDOR SELLER VENDEUR Denominaci n del aparato Denomina o do aparelho Equipment name D nomination de l ppareil Referencia...

Страница 46: ...ejercitar los derechos conforme a esta Garant a Comercial el consumidor dispone de las siguientes v as de reclamaci n E mail ferlux ferlux es Web www ferlux es Direcci n Pol gono el Polear parc 1 C P...

Страница 47: ...47...

Страница 48: ...Chimeneas y Barbacoas FERLUX S A Parque Empresarial El Polear Parc 1 29313 Villanueva del Trabuco M LAGA Espa a www ferlux es e mail ferlux ferlux es...

Отзывы: