HNC 47.82
31
Setup and installation
1
2
3
4
5
Fig. 13: Machine connections at the rear
1 Main switch
2 Mains connection C14
3 Rotation speed control (0-10 volts) (not with HF motors)
4 Connection for the machine head (not with HF motors)
5 Extraction/cable guides
Mains connection machine
Connect the machine using the C13 plug at the rear of the machine to the power
supply.
Mains connection machine head
The tool (router motor) is connected to the machine head. The voltage is the same
as the input voltage of the machine.
1.
Connect the router motor using the power cable to the plug on the machine
head.
2.
Connect the optional rotation speed control.
3.
Fix the cable to the guide on the machine head (using a cable tie or sim-
ilar).
Содержание Hammer HNC 47.82
Страница 47: ...HNC 47 82 47 Maintenance Y axis 1 Fig 22 Screws for the side cover 1 Screws for the side cover...
Страница 55: ...HNC 47 82 55 Maintenance Y axis 1 Fig 29 Screws for the side cover 1 Screws for the side cover...
Страница 62: ......
Страница 63: ...Felder KG KR Felder Stra e 1 6060 Hall in Tirol 43 0 5223 5850 0 info felder group com www felder group com...