28
Setup and installation
●
Provide sufficient light at the workstation.
●
Sufficient clearance or screening from neighbouring workstations.
●
Set the levelling feet and then check that the machine is level using a spirit
level. All 4 of the adjustable feet must sit flush to the floor.
1
Fig. 10: Levelling feet
1 Levelling feet
Accuracy:
In order to be able to achieve the accuracy stated, the machine
must be placed on a stable concrete floor.
8.5
Attach the mounting plate for the router motor using screws
The mounting plate is delivered already pre-mounted. If it is has to be removed or
moved then refer to the individual assembly instructions.
Содержание Hammer HNC 47.82
Страница 47: ...HNC 47 82 47 Maintenance Y axis 1 Fig 22 Screws for the side cover 1 Screws for the side cover...
Страница 55: ...HNC 47 82 55 Maintenance Y axis 1 Fig 29 Screws for the side cover 1 Screws for the side cover...
Страница 62: ......
Страница 63: ...Felder KG KR Felder Stra e 1 6060 Hall in Tirol 43 0 5223 5850 0 info felder group com www felder group com...