Operation
BOMAG
24
BPR 25/40, BPR 25/50
4.1
General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter 3 “Indicators
and control elements” before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
4.2
Tests before taking into op-
eration
The following inspections must be carried out be-
fore each working day or before a longer working
period.
!
Danger
Danger of accident!
Please observe strictly the safety regulations
in chapter 2 of this instruction manual!
l
Park the machine on ground as level as possi-
ble.
l
Cleaning the machine.
Check:
l
condition of engine and machine
l
fuel tank and fuel lines for leaks
l
screw joints for tight fit
i
Note
For a description of the following tasks refer to the
chapter "Daily maintenance".
l
Engine oil level, top up if necessary
l
Fuel level, top up if necessary.
l
Water level
*
, top up if necessary.
*
Optional equipment
Go to
Discount-Equipment.com
to
order your parts