background image

4

 

 

The incoming service must be of sufficient size to supply 

full rate without excessive pressure drop. A gas meter is 

connected to service pipe  by  gas supplier. Any existing 

meter  should  be  checked  preferably  by  gas  supplier  to 

ensure  that  it  is  adequate  to  deal  with  rate  of    gas 

supply required.

 

The  gas  supply  tubing  or  hose  shall  comply  with 

national  requirements  in  force.  It  shall  be  periodically 

examined and replaced as necessary.

 

Installation pipe work should be fitted in accordance with 

IGE/UP/2. The size of pipes from meter to unit must not 

be  less   than   that   of   appliance   inlet   connection. 

A 3/4" BSP inlet connection is fitted to unit.

 

An  isolating  valve  must  be  located  close  to  the  unit  to 

facilitate  shut  down  during  an  emergency  or  routine 

servicing.  This  must  be  easily  accessible  to  the  user. 

The installation must be tested for gas tightness as stated 

in IGE/UP/1.

 

Domestic  type,  flexible  rubber  tube  connections 

must NOT be used with this appliance.

 

Only tube complying with BS669 Part 2, specification 

of  corrugated  metallic  flexible  hoses  for  catering 

appliances, shall be used.

 

 

1.5 ELECTRICAL SUPPLY

 

The  unit  is  equipped  with  a  3-core  flexible  cord  with 

standard  3  pin  plug  fitted  with  a  13A  fuse.  A  regular 

13A socket outlet can be used.

 

If  supply  is  provided  through  a  distribution  fuse  box, 

it must be via a fuse with a maximum rating of 13A.

 

In  the  event  of  mains  cable  being  replaced,  any  new 

cable  should  comply  with  60245  IEC  57  designation. 

(H05 RN - F)

 

 

 

Rated Voltage

 

Rated Current

 

G3840/G3840F

 

230V~

 

3.55amps

 

THE APPLIANCE MUST BE EARTH BONDED.

 

1.6 TOTAL RATED HEAT INPUTS 

Natural and Propane Gas

 

22kW (nett)     82,500 btu/hr (gross)

 

1.7 INJECTOR SIZES 

Natural Gas

 

Burner                            Pilot

 

2 x Ø2.6mm                   Polidora G31.2

 

Propane Gas

 

Burner                            Pilot

 

2 x Ø1.7mm                   Polidora G25

 

SECTION 2 - ASSEMBLY and

 

COMMISSIONING

 

The gas supply piping and connection to appliance must 

be  installed  in  accordance  with  the  local  regulations  in 

conjuncion with those listed on the cover of this manual.

 

2.1 ASSEMBLY

 

a) Unpack appliance

 

b) Unpack fryer baskets and accessories.

 

c) Place basket support grid and basket in pan.

 

d) Level appliance and fit all service protection kits.

 

(Anti-tilt kit is supplied).

 

 

 

2.2 CONNECTION TO A GAS SUPPLY

 

Connect gas supply and test for gas soundness.

 

Caution - Ensure that pan contains an acceptable level 

of liquid before igniting burner.

 

Due to the presence of mains electrics, integral pipe work 

should  be  checked  for  gas  soundness  using  an 

appropriate  gas leak detector.

 

Caution - Installation engineers should note that for first 

time connection of fryer, it is essential that inlet supply to 

fryer  be  completely  purged  of  air  prior  to  first  lighting 

attempt. Otherwise, since this is a “light pilot  first every 

time” system, it will take a significant number of attempts 

to light due to the small amount of air bled from pipe by 

pilot at each attempt.

 

This should not be initially treated as a fault.

 

Please  note  that  several  attempts  will  still  be  required 

after  air  purge  for  first  time  lighting.  This  is  due  to  the 

capacity of valve and governor.

 

 

2.3 CONNECTION TO AN ELECTRICAL SUPPLY

 

Ensure flexible cable does not come into contact with any 

hot parts. The fuse rating should be 13A.

 

Colour coding of power supply cables is as follows: 

Live - Brown,  Neutral - Blue, Earth - Green/Yellow

 

2.4 STARTING UP

 

When using fat melting cycle and loading solid fat for the 

first time, always remove fryplate as detailed in Section 9.

 

Solid  fat  should  be  in  direct  contact  with  fryer  pan. 

Refer to Section 9.

 

Содержание G3840

Страница 1: ...er in Charge for reference during servicing Further to this the user instructions should be handed over to the user having had a demonstration of the operation and cleaning of the appliance PREVENTATI...

Страница 2: ...clearly caused by misuse Where an engineer finds no fault with a product that has been reported faulty Re setting or adjustment of thermostats when unit is operating to specification Cleaning and unb...

Страница 3: ...learance of at least 150mm to rear between unit and any combustible wall Important If fryer is to be installed with other appliances then the instructions for every model should be consulted to determ...

Страница 4: ...ross 1 7 INJECTOR SIZES Natural Gas Burner Pilot 2 x 2 6mm Polidora G31 2 Propane Gas Burner Pilot 2 x 1 7mm Polidora G25 SECTION 2 ASSEMBLY and COMMISSIONING The gas supply piping and connection to a...

Страница 5: ...n thermostat demands heat i e oil temperature is more than 5 C below temperature setting Extinguishes when desired temperature is reached Figure 3 Additional Controls 3 Burner Lock Out Reset Switch Re...

Страница 6: ...Using The Controller Section 6 2 3 2 5 2 Checking Oil Filtration Pump To check operation of oil filtration pump refer to Section 7 Important After installation the responsible technician should check...

Страница 7: ...m both sides of valve c Disconnect pilot pipe d Remove screws holding valve to bracket e Replace in reverse order Check system for gas leaks f Reset burner pressure as detailed in Section 1 4 3 5 PILO...

Страница 8: ...ace in reverse order Note Check for oil leaks before replacing any panels 3 13 IGNITION CONTROL BOX a Remove rear compartment cover b Unplug valve and control plugs Remove ignition detector and earth...

Страница 9: ...SIONS 187 24 min 26 max Timer Pump Settings Set for 230V Operating thermostat probe Set to 0 8 8 3 6 Setto10minutes 10 Safety thermostat probe Operating and Safety Thermostat Wu Set to Wu 23 17 5 258...

Страница 10: ...r supply failure Please ensure that any plastic coated items are removed prior to use Before operation pan requires to be washed out and thoroughly dried Discolouration of heated parts is caused by fa...

Страница 11: ...oil temperature will then be governed by controller to desired set temperature selected by user on the control knob SECTION 7 CHANGING FILTERING THE OIL Warning After filtering wait 30 seconds before...

Страница 12: ...ll liquid has been drained from fry pot The following procedure should be undertaken AT LEAST DAILY IMPORTANT Disconnect electrical supply before any cleaning commences Warning Oil must be allowed to...

Страница 13: ...rature probe Ensure FAT MELT CYCLE is selected for this process Note Fry plate will lower slowly into fry pot as solid fat melts Warning If fry plate does not sit flat lift plate from centre slightly...

Страница 14: ...SECTION 11 WIRING DIAGRAM for G3840 14...

Страница 15: ...SECTION 11 WIRING DIAGRAM for G3840F 15...

Страница 16: ...CIRCUIT DIAGRAM for G3840 16...

Страница 17: ...CIRCUIT DIAGRAM for G3840F 17...

Отзывы: