background image

09-2007

The manufacturers reserve the right to change the products without any previous notice

Distributor’s box

MEC 200

ELECTRO-MECHANICAL SLIDING GATE OPERATOR

IMPORTANT WARNING NOTES

- Before installing the equipment carry out a 

Risk Analysis

 and fit any required device in compliance with EN 12445 and

EN 12453 Safety Norms.

- lt is recommended to keep to the instructions in this booklet - make sure that the motor specifications as printed on the

motor sticker conform to those of the mains.

- Dispose properly of the packaging materials such as cardboard, nylon and polystyrene through specialized companies.
- Should the operator be removed, 

do not cut

 the electrical cables, but properly remove them by loosening the pins in the

terminal board.

- Switch off the mains switch before the cover of the cable junction box is removed.
- All the equipment must be properly earthed by the yellow/green cable marked with the specific symbol.
- It is recommended to carefully read the regulations, advice and remarks in the book “Safety Norms”.

The growth of MECCANICA FADINI has always been based on the development of guaranteed products thanks to our “TOTAL
QUALITY CONTROL” system which ensures constant quality standards, updated knowledge of the European Standards and
compliance with their requirements, in view of an ever increasing process of improvement.

EUROPEAN MARK CERTIFYING CONFORMITY
TO THE ESSENTIAL REQUIREMENTS OF THE
STANDARDS 98/37/EC

  DECLARATION OF CONFORMITY

SAFETY NORMS

  EN 12453, EN 12445 STANDARDS

  CEI EN 60204-1 STANDARDS

  WARRANTY CERTIFICATE ON THE CUSTOMER'S REQUEST

The “CE” mark certifies that the operator conforms to the essential requirements of the European Directive art. 10 EEC 73/23, in
relation to the manufacturer’s declaration for the supplied items, in compliance with the body of the regulations ISO 9000-UNI EN
29000. Automation in conformity to EN 12453, EN 12445 safety standard.

CHECKING AND MAINTENANCE

:

To achieve an optimum performance and longer life of the equipment and in observance of the safety regulations, it is recommended
that inspections and proper maintenance are made by qualified technicians to the whole installation ie. both the mechanical and
electronic parts, as well as wiring.
- Mechanical parts: maintenance every 6 months approx.
- Electronic apparatus and safety equipment: maintenance every month approx.

DISPOSE OF PROPERLY

ENVIRONMENT-NOXIOUS MATERIALS

2003/108/CE 

Directive for

waste electrical and
electronic equipments

GB

AUTOMATIC GATE MANUFACTURERS

s.n.c.

®

Via Mantova, 177/A - 37053 Cerea (Verona) Italy
Tel. +39 0442 330422 r.a. - Fax +39 0442 331054

e-mail: [email protected] - www.fadini.net

Содержание MEC 200

Страница 1: ...Electro mechanical sliding gate operator Vertical and horizontal installation Gear movements and worm gear coupling in oil bath fully mounted on ball bearings GB Installation manual MEC 200...

Страница 2: ...t into an unbalanced travelling of the gate IMPORTANT Make sure that gate stops are fixed in the open and closed gate positions so that the gate does not over travel the permitted limit and go out of...

Страница 3: ...lease spanner E17 supplied with the equipment the gate can be freely moved by hand Temporary clamp the rack to the gate so that it can adequately mesh the driving gear the rack must mesh the driving g...

Страница 4: ...se items Pic 6 The safety pneumatic edge is to be fitted to the gate edge and is connected to the control box by a cable to be automatically rewound to take up the slack A remote controlled switch can...

Страница 5: ...tton switches are required N W To fit extra accessories such as lights CCTV etc use only solid state relays to prevent damages to the microprocessor DIP SWITCH 1 4 5 6 7 8 2 ON OFF 3 Dip Switch 1 ON P...

Страница 6: ...opening reverse it on closing in case of an obstacle Button switch 3 4 5 6 STOP COMMON OPEN CLOSE Limit switch 10 COMMON 8 9 LIMIT SWITCH CLOSE LIMIT SWITCH OPEN Radio Contact 7 3 COMMON RADIO CONTACT...

Страница 7: ...Automatic Closing OFF No Automatic Semi automatic closing by pulse Automatic Semiautomatic Automatic Operation any pulse opens the gate the gate stays open as long as the Dwell time expires as set by...

Страница 8: ...r Dip Switch 1 ON Photocells Stop on opening 2 ON Radio No reverse on opening 3 ON Automatic closing 4 ON Preflashing activated 5 ON Radio Step by step stop in between 6 ON Dead Man Control Dip 4 OFF...

Страница 9: ...pulsing Step by step 2 5 ON Step by step Stop in between OFF Standard operating mode ON Gate is not reversed while opening OFF Any pulse reverses the gate DIP SWITCH 2 and 5 NEVER set BOTH of them to...

Страница 10: ...switch Open off when gate is open L10 It stays on for a time equal to the time set on T4 SINGLE THREE PHASE FOR SLIDING GATE OPERATORS MEC 200 PLUS 70 3 GB Single 230V and Three phase 400V Motors MOT...

Страница 11: ...ommended to fit three phase operators with a safety device consisting of a switch to cut off power to the low voltage circuit Connections are in series with the limit switch common terminal pic 9 The...

Страница 12: ...ntrol The system is in an oil bath and can be adjusted to the gate weight Adjusting is by a screw which is located on one side of the operator pic 11 A special spanner E17 is provided with the equipme...

Страница 13: ...ating 230 400 V 230 V 25 W 24 V 10 W 1 100 W 5 A 1A 630 mA Open Stop Close 290x205x140 IP 437 VDE CSA DEMCO SEV 10 A 230 V 4 A 400 V 20 VA 1 5 W 0 5 thick 0 230 V 0 12 18 24 V 50 60 Hz 4 Kv x 1 T215K...

Страница 14: ...14 MEC 200 OVERALL DIMENSIONS 467 245 174 130 290 60 38 498 1 000 160 130 290 92 467 172 92 280 260 120 200 PIC 13 MEC 200 VERTICAL MEC 200 HORIZONTAL FIXING BASE PLATE 1 meter LENGHTS GEAR RACK...

Страница 15: ...T STEEL GEAR RACK 22 x 22 mm THICKNESS STEEL GEAR RACK WITH FIXING SLOTS NYLON GEAR RACK 8 mm THICKNESS POWER CUT OFF DEVICE E 17 RELEASE SPANNER FIXING BASE PLATE LIMIT SWITCH STRIKING PLATES FOR SCR...

Страница 16: ...knowledge of the European Standards and compliance with their requirements in view of an ever increasing process of improvement EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF TH...

Отзывы: