background image

SCREWS TO FIX
THE COVER - 

A

PROTECTION COVER

4 Nos. FIXING
SCREWS - 

B

MEC 200 HORIZONTAL

2

INSTRUCTIONS TO FIT THE VERTICAL AND HORIZONTAL MEC 200
OPERATORS TO A SLIDING GATE

FOR A PROPER AND PERFECT PERFORMANCE OF MEC 200 READ THE INSTRUCTIONS THAT ARE OUTLINED IN THIS MANUAL AND
KEEP TO THE DIAGRAMS.
Mec 200 is an extremely versatile system and can suit any sliding gate as it can be mounted either vertically or horizontally, and the motor
is available in different power specifications such as 0.37 KW (0.5 HP single- and three-phase); 0.73 KW (1.0 HP single- and three-phase);
1.1 KW (1.5 HP three-phase only). It is a strong and reliable automation. It has a torque control device that can be manually adjusted;
worm and gear are made of bronze and steel and are supported by bearings, in an oil bath. A manual overriding system allows manual
operations of the gate in emergency events like power failure.

POINTS TO CHECK WITH THE GATE
- Check that the gate track is well fixed to a solid foundation to prevent deformation which would result into an unbalanced travelling of

the gate.

- IMPORTANT: Make sure that 

gate stops

 are fixed in the

 open

 and 

closed

 gate positions so that the gate does not over travel the permitted

limit and go out of the upper guide.

- IMPORTANT: Make sure that, once at the end of the permitted travel, the gate does not hit the gate posts or special gate stops to avoid

damages to its structure.

FITTING MEC 200 ON TO THE FIXING BASE PLATE
- The first operation is to fix the 

fixing base plate

 to the ground and make sure that it is perfectly 

levelled

. Fixing distances are as indicated

in pic.1 here below. Fixing is by setting the plate into a 

concrete

 foundation.

- Remove the MEC 200 

cover

 by loosening the three 

screws-A

 and pulling it upwards; Temporary fix the MEC 200 operator to the 

fixing

base plate

 by means of the 

four screws-B

. (pic. 2).

FIXING BASE PLATE
TO SET IN CONCRETE

GROUND

MEC 200 HORIZONTAL

SPIRIT LEVEL

GROUND

MEC 200 VERTICAL

FIXING
BASE PLATE
TO SET IN
CONCRETE

- Remove the MEC 200 

cover

 by loosening the three 

screws-A

 and pulling it upwards; temporary fix the MEC 200 operator to the 

fixing

base plate

 by means of the 

four screws-B

 (pic.2).

PROTECTION
COVER

SCREWS TO FIX
THE COVER - 

A

4 Nos. FIXING
SCREWS - 

B

MEC 200 VERTICAL

PIC. 1

PIC. 2

Содержание MEC 200

Страница 1: ...Electro mechanical sliding gate operator Vertical and horizontal installation Gear movements and worm gear coupling in oil bath fully mounted on ball bearings GB Installation manual MEC 200...

Страница 2: ...t into an unbalanced travelling of the gate IMPORTANT Make sure that gate stops are fixed in the open and closed gate positions so that the gate does not over travel the permitted limit and go out of...

Страница 3: ...lease spanner E17 supplied with the equipment the gate can be freely moved by hand Temporary clamp the rack to the gate so that it can adequately mesh the driving gear the rack must mesh the driving g...

Страница 4: ...se items Pic 6 The safety pneumatic edge is to be fitted to the gate edge and is connected to the control box by a cable to be automatically rewound to take up the slack A remote controlled switch can...

Страница 5: ...tton switches are required N W To fit extra accessories such as lights CCTV etc use only solid state relays to prevent damages to the microprocessor DIP SWITCH 1 4 5 6 7 8 2 ON OFF 3 Dip Switch 1 ON P...

Страница 6: ...opening reverse it on closing in case of an obstacle Button switch 3 4 5 6 STOP COMMON OPEN CLOSE Limit switch 10 COMMON 8 9 LIMIT SWITCH CLOSE LIMIT SWITCH OPEN Radio Contact 7 3 COMMON RADIO CONTACT...

Страница 7: ...Automatic Closing OFF No Automatic Semi automatic closing by pulse Automatic Semiautomatic Automatic Operation any pulse opens the gate the gate stays open as long as the Dwell time expires as set by...

Страница 8: ...r Dip Switch 1 ON Photocells Stop on opening 2 ON Radio No reverse on opening 3 ON Automatic closing 4 ON Preflashing activated 5 ON Radio Step by step stop in between 6 ON Dead Man Control Dip 4 OFF...

Страница 9: ...pulsing Step by step 2 5 ON Step by step Stop in between OFF Standard operating mode ON Gate is not reversed while opening OFF Any pulse reverses the gate DIP SWITCH 2 and 5 NEVER set BOTH of them to...

Страница 10: ...switch Open off when gate is open L10 It stays on for a time equal to the time set on T4 SINGLE THREE PHASE FOR SLIDING GATE OPERATORS MEC 200 PLUS 70 3 GB Single 230V and Three phase 400V Motors MOT...

Страница 11: ...ommended to fit three phase operators with a safety device consisting of a switch to cut off power to the low voltage circuit Connections are in series with the limit switch common terminal pic 9 The...

Страница 12: ...ntrol The system is in an oil bath and can be adjusted to the gate weight Adjusting is by a screw which is located on one side of the operator pic 11 A special spanner E17 is provided with the equipme...

Страница 13: ...ating 230 400 V 230 V 25 W 24 V 10 W 1 100 W 5 A 1A 630 mA Open Stop Close 290x205x140 IP 437 VDE CSA DEMCO SEV 10 A 230 V 4 A 400 V 20 VA 1 5 W 0 5 thick 0 230 V 0 12 18 24 V 50 60 Hz 4 Kv x 1 T215K...

Страница 14: ...14 MEC 200 OVERALL DIMENSIONS 467 245 174 130 290 60 38 498 1 000 160 130 290 92 467 172 92 280 260 120 200 PIC 13 MEC 200 VERTICAL MEC 200 HORIZONTAL FIXING BASE PLATE 1 meter LENGHTS GEAR RACK...

Страница 15: ...T STEEL GEAR RACK 22 x 22 mm THICKNESS STEEL GEAR RACK WITH FIXING SLOTS NYLON GEAR RACK 8 mm THICKNESS POWER CUT OFF DEVICE E 17 RELEASE SPANNER FIXING BASE PLATE LIMIT SWITCH STRIKING PLATES FOR SCR...

Страница 16: ...knowledge of the European Standards and compliance with their requirements in view of an ever increasing process of improvement EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF TH...

Отзывы: