Page 3
Contents
9.
Other information
9
Page
.1
Butterfly valve (manual or pneumatic)
74
.2
Safety switch for manual butterfly valve
9
Page 75
9
Page
.3
Robot control
76
9
Page
.3.1
Cleaning release by robot
77
9
Page
.4
Different variants for cooling start delay
78
.5
Compressor switch-on delay / pre-agitating
9
Page 80
9
Page
.6
Emergency cooling / sensor failure
80
9
Sensor correction procedure
Page
.7
80
.8
Function second temperature sensor
9
Page 81
9
Page
.9
during cooling
Level alarm
81
9
Page
.10
Automatic / convenience functions
81
.11 Heating control
9
Page 82
9
Page
.12
Function of pressure switch – Effect on pump and heater
82
.13
Air in the cleaning pump -> automatic
9
venting
Page 83
9
Page
.14
Level control setting
84
.15
Detergent injection position
9
Page 85
.16
Configuration of the different
stages
9
Page
cleaning
85
9.17
Setting of a break in the cleaning programme
Page 86
9.18
Page 86
Function test alarm
9.19
Activation delay tank monitor
Page 87
.
Procedure following power failure
88
9 20
Page
9 21
Power
Page
.
pack (optional)
88
9 22
Page
.
Agitator monitoring module (optional)
89
9.2
Page
3
90
General measures when using electronic control systems
Содержание DARI-KOOL GALA-KOOL Pro
Страница 29: ...Page 29...
Страница 58: ...Page 58 8 Setting of parameters...