![Fabdec CB2-1L120000 Скачать руководство пользователя страница 87](http://html.mh-extra.com/html/fabdec/cb2-1l120000/cb2-1l120000_installation-and-operation-manual_535775087.webp)
9. Other Information
9.19 Activation delay tank monitor [H90]
The activation delay of the tank monitor is required to test the operation modes during
the commissioning without activating false alarms.
Activation
Delay is activated by the start of the
and suppresses all errors from F1
Gala-Kool Pro
to F38 for a pre-set time (with the exception of F30).
After expiration of the set time, the tank monitor is set to the basic condition and then
activated.
Page 87
Содержание CB2-1L120000
Страница 29: ...Page 29 ...
Страница 58: ...Page 58 8 Setting of parameters ...