ATTENTION: Study the control board and read this section
thoroughly before attempting to operate your gate opener.
&
%
Warnings:
•
Before attempting any job on the control board (connections, maintenance), turn
off electrical power and unplug the support battery.
•
Install, upstream of the system, a differential thermal breaker with adequate
tripping threshold.
•
Always separate power from control and safety cables (push-buttons, receivers,
photocells, etc.). To avoid any electrical noise, use separate sheaths or a shielded
cable (with earthed shield).
%
&
%
&
LED
Programming LEDs
P
Power ON and diagnostics LED
P1
“Function” programming push-button
P2
“Value” programming push-button
F1
Battery and motor fuse - F15A
J1
Accessories Terminal board
J2
Transformer Terminal board
J3
Motor connection terminal
J4
Battery connector
J5
Minidec connector/RP receiver
P
Power ON and diagnostic LED
F1
Battery and motor fuse - F15A
J2
Bus connection terminal board
J3
Motor connection terminal board
J4
Battery connector
Содержание Estate Swing
Страница 1: ...Featuring ...
Страница 34: ... ...