background image

Instruction Manual for the  

Featuring

 

Manufactured by

 

E-S 1100 / E-S 1102 Series 

! Warning ! 

Read all instructions before beginning installation or use 

of this gate operator. 

 

This operator exerts a high level of force. 

 

Exercise caution at all times and stay clear of the system 

during operation. 

Содержание Estate Swing E-S 1100 Series

Страница 1: ...ctured by E S 1100 E S 1102 Series Warning Read all instructions before beginning installation or use of this gate operator This operator exerts a high level of force Exercise caution at all times and...

Страница 2: ...tallation must conform to Standards EN 12453 and EN 12445 The safety level of the automated system must be C D 10 Before attempting any job on the system cut out electrical power and disconnect the ba...

Страница 3: ...ed on 2 leaf gates only is controlled by the MASTER equipment to which all accessories and pulse generators are connected The MASTER card can be pro grammed and is used to set the following function l...

Страница 4: ...n 1 4 Pre installation charging 2 Control Board Layout 2 1 IMPORTANT Charging Battery Prior to Use 2 2 3 Basic Installation 3 IMPORTANT 5 x 5 Setback 3 1 Installation of Mounting Hardware and Arm 3 2...

Страница 5: ...bleshooting 7 2 6 Logic Summaries and Flow Charts 7 7 8 Alternate Mounting and Programming 8 Push to Open Installation 8 1 5 Complete Learning Process 8 6 10 Accessories 9 Accessory Terminals 9 1 2 Ph...

Страница 6: ...hour 5 Consecutive cycles on charged battery Max 15 Battery recharge time 10 min for each full cycle Operating ambient temperature 4 to 131 Deg F Operator weight lbs 4 85 Protection class IP 44 Gate...

Страница 7: ...ll prevent alteration of alignments and leveling during installation and during cycles 1 2 Standard System Overview and Safety Zones The system display to the right is a recommended standard system Ot...

Страница 8: ...r nut 1 1 4 x1 Hex bolt washer nut 4 1 4 x1 1 2 Carriage bolt washers nut A Control Box B Operator Arm C Gate Mount Bracket D Post Mount Brackets G Post Mounting nut Manual Release Key Bracket Bushing...

Страница 9: ...rriage Bolts with nuts and washers will be needed to connect the L shaped Length will be determined by the size of your posts A metal support bracket may be needed to achieve the appropriate 5 x 5 set...

Страница 10: ...cables push buttons receivers photocells etc To avoid any electrical noise use separate sheaths or a shielded cable with earthed shield Layout of Master Control Board Layout of Slave Control Board LED...

Страница 11: ...ry into the control board fig 1 For charg ing purposes it is not necessary to hook the receiver to the battery or control board 2 Insert the wires from the suppliedAC transformerinto terminal J2 of th...

Страница 12: ...f the master must connect with the left side of the slave fig 3 NEVER CONNECT POWER FROM ANY SOURCE DIRECTLY TO THE SLAVE BOARD The slave board may ONLY be connected to the Master control board Let th...

Страница 13: ...point for your opener arm Position your mounting bracket so one of the holes lines up with the determined post pivot point 3 1 IMPORTANT 5 x 5 Setback The 5 x 5 is a very important requirement to be...

Страница 14: ...ed an extension piece added to make contact with the doorstop Examples of stops Examples of industrial door stops 2 First clamp the L shaped post mounting bracket to the post The side with two holes r...

Страница 15: ...s the front stop position Extend the operator pin in this manner ONLY Any other method may damage the arm NOTE The front stop position IS NOT THE FULL CLOSED POSITION it is the common point of referen...

Страница 16: ...the manual release key Turn the key clockwise until the front fitting reaches the front stop position The bracket bushing is now locked in position on the front fitting NOTE The front stop position I...

Страница 17: ...top to check levelness as it is a sloped surface Make the appropriate adjust ments and check your setback one last time to be sure the positioning did not shift during leveling 11 In order to remove y...

Страница 18: ...ucture and a nut on the back side of the structure orby welding Always take the proper precautions protective eyewear etc when drilling or welding 14 After properly affixing the mounting brackets inse...

Страница 19: ...tach the control box to the post 4 There are three separate knockouts on the bottom of the control box Find a water tight connector at your local hardware store that will fit one of the knockout as we...

Страница 20: ...strip at the bottom of the control board is easily re moved for wiring Simply pull straight down on the terminal strip to remove it from the board It will slide right off Slide it back on when you ar...

Страница 21: ...minals together with the fourth which will lead to the com mon terminal The connection can be secured with electrical tape or a wire nut This allows one terminal to be freed for a safety device but th...

Страница 22: ...connect with the RIGHT side of J2 on the Slave board Terminal 15 MUST connect with the LEFT side of J2 on the Slave board J3 Actuator Connections This terminal is used to connect the operator arm to...

Страница 23: ...er to the Estate Swing This will destroy the Estate Swing control board 3 Before plugging in your transformer plug the battery into the control board The clear plastic clip gets clipped into J4 with t...

Страница 24: ...l open By selecting Logic EP 4 all pause times will be void and the gate will remain open until an opening devices is triggered C Switches between the amount of time the gate waits before beginning mo...

Страница 25: ...nt of safety It has an increased amount of motion stop points 4 EP Stepped Semi automatic is designed to function similar to a garage door opener Turns off the auto close setting B Pause Times 1 5 Sec...

Страница 26: ...uver and the function LEDs begin flashing Continued on the next page 6 3 Enter Learning Mode Enter the programming mode by pressing P1 6 times until all 5 LEDs A B C D E are lit This is the learning m...

Страница 27: ...stops The learning procedure has finished Press P1 once more to exit the learning mode before attempting to operate the open er 6 4 You may now test your gate opener with your transmitter Single Leaf...

Страница 28: ...gth of the receiver wire 3 Using a 6 screw attached the top of the receiver to the post If you are happy with this position use the small provided set screw in the bottom hole to secure the receiver i...

Страница 29: ...ceiver This could mean 1 button on 400 different remotes or this could mean all 4 buttons on 100 remotes or anything in between Some choose to program all 4 buttons to a single receiver if they are no...

Страница 30: ...for 5 minutes and then the board returns to all LEDs OFF WARNING When you access the input status function all acces sories are pow ered even with the gate idle P1 is active and can be used to open a...

Страница 31: ...the left and Brown wire connected to the right Reverse the polarity for Push To Open Operation Check the fuse to be sure the fuse is not blown It can be tested visually or with a volt meter by checki...

Страница 32: ...s mid cycle Check the force setting D variable 4 is the highest Try moving the force to high Check the speed setting E variable If the gate is heavy and moves too quickly sometimes the jerk of the gat...

Страница 33: ...e slave is not communicating with the master check your connection to the slave and the polarity of the connection Section 9 If using an accessory to open the gate see which terminals it is wired to T...

Страница 34: ...are Torax screws use a Torax screwdriver size T 20 to remove the screws After the screws are removed and the unit is still lying on its back lift upward on the bottom half of the casing The dust shie...

Страница 35: ...quired to e mail digital photos to the technician This is done in your best interest to save unnecessary shipping expenses and time lost Many times we can come up with solutions to issues by seeing pi...

Страница 36: ...ct Reverses direction of motion No effect Reverses direction of motion Stopped in mid cycle Closes the leaf No effect Logic S Logic S safety is designed for higher control and accelerated levels of sa...

Страница 37: ...irection of motion Stopped in mid cycle Closes the leaf No effect Logic EP Logic EP stepped semi automatic is designed to function similar to a garage door opener At full open the gate does not re clo...

Страница 38: ...lose to the post or many other rea sons Installation of PTO Mounting Hardware 1 Set up open stop points for your gate The open stop points can be a plate on the end of the gate that comes in contact w...

Страница 39: ...on the L shaped bracket Insert the 3 8 x1 bolt and loosely affix the nut and washer 4 Measure the 5 x5 setback that was elaborated on in the beginning of this section 5 Using the rear hole on the tea...

Страница 40: ...mage the arm NOTE The front stop position IS NOT THE FULL CLOSED POSITION it is the common point of reference for counting manual 8 Insert the bracket bushing into the gate mounting bracket 9 While ho...

Страница 41: ...during leveling With the brackets clamped in place be sure that the gate can move to the full closed position 14 Attach the mounting brackets either using a carriage bolt or lag bolt with a washer on...

Страница 42: ...h To Open connect the Brown wire on the Left and Blue wire on the Right 8 5 14 After properly affixing the mounting brackets insert the arm fittings into the mounting brackets Using the provided nut a...

Страница 43: ...r double leaf Make sure the leaves are closed Procedure for single leaf gates While the 5 LEDs are lit steadily hold down P2 for about 3 seconds The operator will start the maneuver process Using P2 B...

Страница 44: ...P2 3 Press P2 to teach leaf deceleration starting point for closing 4 Let the leaf make contact with the full closed stop point Press P1 to exit the learning mode You may now test your gate opener or...

Страница 45: ...open Procedure for dual leaf gates While the 5 LEDs are lit steadily hold down P2 for about 3 seconds The operator will start the maneuver process Using P2 Briefly press the button once for each of t...

Страница 46: ...pen stops 4 alt Press P2 to stop the openers opening motion and reverse the motion of the gate Without open stops press P2 8 9 3 Press P2 to teach leaf 2 opening decelera tion starting point 5 Press P...

Страница 47: ...point Leaf 1 will begin closing 7 Press P2 to teach leaf 1 closing decelera tion starting point 8 Let the leaf 1 make contact with the full closed stop point Press P1 to exit the learning mode You may...

Страница 48: ...he gate leaf controlled by the mastercontrol board if there is only one leaf it will control the one leaf 3 Stop Command This is a normally closed terminal where by any device i e push button which by...

Страница 49: ...ing the master and slave board This will cause permanent damage to both boards and will void the warran ty Caution 7 8 Positive 7 8 24 Voltage Positive 24V for powering accessories that are run by 24V...

Страница 50: ...crushing Closing Safety Devices They operate only during the gate closing movement and therefore are suitable for pro tecting the closing zone against the risk of impact Opening Closing Safety Device...

Страница 51: ...9 4 Estate Swing...

Страница 52: ...Button Intercoms Normally Open NO or Input INP or Relay of entry device 1 terminal on gate opener control board Common COM or Ground GND or Relay of entry device 13 terminal on gate opener control boa...

Страница 53: ...Negative battery lead of gate opener battery Terminal 3 of lock control board Negative black lead of gate lock Terminal 4 of lock control board Positive lead of gate lock Terminal 5 of lock control b...

Отзывы: