Preparing Cable Pass-through Modules
The 525C five-cable pass-through module is used by the TLP Pro 525C only. The Series/2
Connectivity Bracket eight-cable pass-through module can be used by either touchpanel. The
two modules are assembled by slightly different methods.
Assembling the 525C Pass-through Cable Module
Figure 14 shows the grommet plate attached
to the bottom of the connectivity bracket.
It can also be attached to the top of the
bracket by turning it over and inserting the
four tabs into the holes at the top of the
module (see figure 12 on the previous page).
1.
Insert the cable into the grommet plate
(see figure 14,
1
).
2.
Pass the cables through the connectivity
bracket from the bottom.
3.
Fill any unused holes with the provided
plugs.
4.
Slot the four tabs of the grommet plate
into the four holes of the connectivity
bracket (
2
).
5.
Secure the grommet plate to the
connectivity bracket using the captive
screw (
3
) that is provided with the
grommet plate.
6.
Insert the assembled cable pass-
through module into the touchpanel
enclosure (see
e
21-
918
1
2
3
Figure 14.
Assembling the 525C Cable
Pass-through Module
Assembling the Series/2 Cable Pass-through Module
3
2
1
4
Figure 15.
Assembling the Series/2
Cable Pass-through Module
1.
Pass the cables through the connectivity
bracket from the bottom (see figure 15,
1
).
2.
Insert the cable into the grommet plate (
2
).
3.
Fill any unused holes with the provided plugs
(
3
).
4.
Attach the grommet plate to the top of
the connectivity bracket, using four of the
provided #4-40 screws (
4
).
5.
Insert the assembled cable pass-through
module into the touchpanel enclosure (see
TLP Pro 525C and 725C Series Touchpanels • Mounting
18