CHAPTER 31
PAGE 3
MAINTENANCE MANUAL EXTRA 300/SC
PAGE DATE: 12. February 2019
31-10-00
INSTRUMENT PANEL
Description and Operation
The instrument panel consists of an aluminium sheet which
is canted several times. It is fastened to the main fuselage
cover and the steel frame with machine screws, bolts and
special washers. The instrument panel top cover is part of the
main fuslage cover, which itself is furnished with an instru-
ment access panel as shown in Chapter 51-00-01.
Figures 1 and 2 in connection with the related charts on the
next page show the equipment of the instrument panel. The
chart may be modified by the minimum equipment require-
ments of individual certifiying authorities.
If the optional MVP-50P is installed, the lower part of the
instrument panel is changed (refer to Chapter 77-40).
Содержание 300/SC
Страница 64: ...CHAPTER 27 PAGE 5 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 2 Control Surface Deflections...
Страница 73: ...CHAPTER 27 PAGE 14 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 10 Aileron Control...
Страница 92: ...CHAPTER 27 PAGE 33 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 21 Trim Tab Rigging...
Страница 96: ...CHAPTER 28 PAGE 5 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 1 Fuel System...
Страница 100: ...CHAPTER 28 PAGE 9 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 2 Storage...
Страница 113: ...CHAPTER 28 PAGE 22 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 9 Distribution...
Страница 115: ...CHAPTER 28 PAGE 24 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 10 Fuel Selector Valve and Control Rod...
Страница 122: ...CHAPTER 28 PAGE 31 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 14 Indicating...
Страница 137: ...CHAPTER 32 PAGE 11 PAGEDATE 12 February2019 MAINTENANCEMANUALEXTRA300 SC Figure 5 Layer Sequence Wheel Fairing...
Страница 138: ...CHAPTER 32 PAGE 12 PAGEDATE 12 February2019 MAINTENANCEMANUALEXTRA300 SC Figure 6 Brake System...
Страница 182: ...MAINTNANCEMANUALEXTRA300 SC PAGEDATE 12 February2019 CHAPTER 53 PAGE 11 GENERAL Figure 7 Layer Sequence Side Cover...
Страница 183: ...MAINTNANCEMANUALEXTRA300 SC PAGEDATE 12 February2019 CHAPTER 53 PAGE 12 Figure 8 Layer Sequence Side Cover...
Страница 210: ...CHAPTER 73 PAGE 17 MAINTENANCEMANUALEXTRA300SC PAGEDATE 12 February2019 or 1 2 3 Figure 8 Mixture Control Cable Rigging...
Страница 228: ......
Страница 229: ......