![Extra 300/SC Скачать руководство пользователя страница 173](http://html1.mh-extra.com/html/extra/300-sc/300-sc_maintenance-manual_2454129173.webp)
CHAPTER 51
PAGE 42
MAINTENANCE MANUAL EXTRA 300/SC
PAGE DATE: 12. February 2019
7
Remove sanding dust with a pneumatic vacuum cleaner and
solvent clean the surface area of the hole in the spar web
with isopropyl alcohol, carbon-tetrachloride or acetone in
case dirt or grease was introduced during the preparation.
8
Prepare a sufficient amount of epoxy resin compound L20/
960. The weight ratio is: 100 parts L20 with 34 parts 960
(ref. Chapter 51-30-01). Record quantities of parts to be
mixed, ambient air temperature and humidity.
9
Apply a sufficient amount of epoxy resin compound L20/
960 to the exposed surface area of the hole and the ring
surface area of the main spar web. Additionally apply "HB15"
compound.
10
Apply a sufficient amount of epoxy resin compound L20/
960 to the outer surface area of the flange bushing which
will be bonded to the spar. Additionally apply "HB15" com-
pound.
11
Apply mold-release agent to the surface of the related wing
main bolt. Insert the bolt to the flange bushing which is still
fixed in the main spar (opposite side) to provide a guidance
for the flange bushing to be bonded to the spar.
12
Insert the flange bushing to the hole. Slide on the main bolt
and slightly rotate the bushing clockwise or counterclock-
wise while it is moved into the hole of the spar web. A con-
tinuous movement is required to minimize entrapped air.
Avoid partly removing and reapplying, as this will cause air
to become entrapped in the bonding gap.
13
Verify epoxy resin compound at the edge of the flange bush-
ing is continuous and free of gaps.
14
Remove excessive resin compound at the flange with cloth
damped with isopropyl alcohol.
15
Do not apply any pressure on the flange bushing prior to
complete curing cycle. Disturbing the flange bushing may
create bonding voids.
16
Apply curing procedure (specified time and temperature):
At elevated room temperature 25°C (77°F) for 10h.
17
Remove the main bolt from the flange bushing.
18
Proceed with final curing at 60°C (140°F) for at least 15h
(refer to 51-70-02).
Содержание 300/SC
Страница 64: ...CHAPTER 27 PAGE 5 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 2 Control Surface Deflections...
Страница 73: ...CHAPTER 27 PAGE 14 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 10 Aileron Control...
Страница 92: ...CHAPTER 27 PAGE 33 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 21 Trim Tab Rigging...
Страница 96: ...CHAPTER 28 PAGE 5 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 1 Fuel System...
Страница 100: ...CHAPTER 28 PAGE 9 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 2 Storage...
Страница 113: ...CHAPTER 28 PAGE 22 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 9 Distribution...
Страница 115: ...CHAPTER 28 PAGE 24 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 10 Fuel Selector Valve and Control Rod...
Страница 122: ...CHAPTER 28 PAGE 31 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 14 Indicating...
Страница 137: ...CHAPTER 32 PAGE 11 PAGEDATE 12 February2019 MAINTENANCEMANUALEXTRA300 SC Figure 5 Layer Sequence Wheel Fairing...
Страница 138: ...CHAPTER 32 PAGE 12 PAGEDATE 12 February2019 MAINTENANCEMANUALEXTRA300 SC Figure 6 Brake System...
Страница 182: ...MAINTNANCEMANUALEXTRA300 SC PAGEDATE 12 February2019 CHAPTER 53 PAGE 11 GENERAL Figure 7 Layer Sequence Side Cover...
Страница 183: ...MAINTNANCEMANUALEXTRA300 SC PAGEDATE 12 February2019 CHAPTER 53 PAGE 12 Figure 8 Layer Sequence Side Cover...
Страница 210: ...CHAPTER 73 PAGE 17 MAINTENANCEMANUALEXTRA300SC PAGEDATE 12 February2019 or 1 2 3 Figure 8 Mixture Control Cable Rigging...
Страница 228: ......
Страница 229: ......