
Preparing the CTS for operation
After replacing the door and retainer, do the following to prepare the CTS for operation:
Perform a...
Successful test
Unsuccessful test
1.
Power-on
■
The bottom LED is lit when
the power-on self-test is
complete.
■
The top and middle LEDs
flash.
Make sure the power cable
and SCSI cable are
correctly installed.
Try the power-on self-test
again. If it fails again,
contact your vendor.
2.
Cartridge
load/unload
■
The cartridge loads and
unloads without getting
caught on the front panel or
bezel.
■
The cartridge gets caught on
the front panel or bezel during
the load or unload operation.
Make sure the front panel
is fully seated and that the
alignment pins are
inserted in the holes in the
side panels.
Make sure the bezel is fully
seated and straight on the
front of the CTS.
■
The CTS door closes after
you pull out the cartridge.
■
The CTS door does not close
after you pull out the cartridge.
Make sure the door
retainer is installed
correctly.
Make sure the front panel
and bezel do not interfere
with the door.
5 Replacing FRUs
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...