
Tools required for maintenance
Refer to Table 1-2 to determine the tools you need to perform the
maintenance procedures described in this manual. Also, a list of the
tools needed for a procedure is provided at the beginning of the
procedure.
To perform this
procedure or replace
this part...
...you need these tools
Magnetic
torque limiting
#0 Phillips
screwdriver
Scissors
Tweezers
EXABYTE
8mm cleaning
cartridge
a
Microcode
load tape
b
Cleaning the CTS
✔
Loading microcode
✔
Removing a data
cartridge
✔
✔
✔
Chassis panels
✔
Deck subassembly
✔
Door and retainer
✔
Front bezel
✔
SLD card
✔
✔
VUA/SUA card
✔
VUA-SLD flex cable
a
To avoid damage to the CTS, you must use an EXABYTE or EXABYTE-approved 8mm cleaning
cartridge.
b
See Chapter 3 for instructions for making a microcode load tape.
CAUTION
Use a magnetic #0 Phillips screwdriver when replacing CTS
parts. The CTS contains very small (M2
×
0.02
×
3.0) screws. If
these screws are dropped through the vent holes in the CTS,
they may cause serious damage.
Table 1-2
Tools needed to perform maintenance procedures
October 1992
1
-
13
1 Before You Begin
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...