
Preparing the CTS for operation
After replacing the SLD card, do the following to prepare the CTS for operation:
Perform a...
Successful test
Unsuccessful test
1.
Power-on
■
The bottom LED is lit when
the power-on self-test is
complete.
■
The top and middle LEDs
flash.
Make sure the power cable
and SCSI cable are
correctly installed.
Try the power-on self-test
again. If it fails again,
contact your vendor.
2.
Update the
microcode
Refer to the
CTS
Monitor User’s
Guide for the 8mm
Cartridge Tape
Subsystem
.
3.
Update the
EEPROM image
Refer to the user’s
guide for your CTS
(EXB-8205 or
EXB-8505).
4.
EXPERT WrtVari
test
Refer to the
EXPERT User’s
Guide for the 8mm
Cartridge Tape
Subsystem
.
5 Replacing FRUs
Содержание EXB-8205
Страница 1: ...510702 000 0 538 0 838 PP 7DSH ULYHV 0DLQWHQDQFH ...
Страница 2: ...EXB 8205 EXB 8505 8mm Cartridge Tape Subsystems Maintenance ...
Страница 5: ...Notes iv 510702 ...
Страница 9: ...viii 510702 ...
Страница 29: ...Notes 1 16 510702 1 Before You Begin ...
Страница 43: ...Notes 3 10 510702 3 Loading New Microcode from Tape ...
Страница 101: ...Notes I 4 510702 Index ...